BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Site work, paving and outdoor lighting for a mixed-use development in Dania Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The purpose of this project is to complete Phase III of Holiday Lighting Power initiative by installing underground electrical utility infrastructure through directional boring. Installation of underground electrical utility infrastructure through directional boring in order to support the operation of holiday lighting displays in designated public areas, (medians on Dania Beach Blvd). The selected contractor will be responsible for all labor, equipment, materials, permitting, and coordination necessary to perform the work. The scope of work for Phase 3B includes construction activities across two (2) medians located along Dania Beach Boulevard, specifically consisting of the 7th and 8th medians east of US-1. These medians are combined and are situated south of Seamen Street at 601 E Dania Beach Boulevard. The 7th median was previously approved under FDOT permit number 2022-H-491-00275. The project includes the installation of pedestal service panels, conduits, wiring, and receptacles on the pedestals. All construction and installation work must adhere strictly to the FDOT 2023-2024 Design Manual and applicable guidelines. The contractor shall be fully responsible for restoring all disturbed areas during construction, including but not limited to sidewalks, fences, landscaping, and roadways. Shop drawings must be submitted to illustrate the proposed routing and installation details for the directional bore, which is conceptually shown in the contract documents. Bidders must include any anticipated changes related to HDPE conduit routing, trenching, additional conduit lengths, etc., within their proposal. As an alternate method, contractors may elect to use directional boring within the medians for conduit installation in lieu of trenching, provided all work remains compliant with the design intent and FDOT standards A bid bond of 5% of the bid price is required for this project. Question Deadline 08/04/2025 at 12:00 PM ET All questions requiring interpretation or clarification of the bidding documents shall be submitted to the projects Q&A in the portal The City intends to award an agreement to the lowest, responsive, responsible Bidder for the requested services specified in the ITB, taking into consideration experience, staffing, equipment, materials, references and past performance. The City reserves the right to reject any and all bids, to waive any informality in a bid and to make an award in the best interests of the City. In case of disputes in the award of the agreement, the decision of the City shall be final and binding on both parties.

Award

Roads / Highways

Public - City

Outdoor Lighting, Paving, Site Work

14

11

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
113
Bidding Soon
1,694
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2025

September 10, 2025

Project location map

W Dania Beach Blvd, Dania Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.