Site work for a water / sewer project in Texas City, Texas. Completed plans call for site work for a water / sewer project.
Each Bid must be accompanied by a Bid bond or a certified or cashiers check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. The deadline to ask questions is 9/02/2025 12:00 AM CST If a certified or cashiers check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashiers check within one (1) business day of receipt of the bid opening. The successful bidder, if any, will be the responsible bidder, which in the Boards judgment will be most advantageous to the District and result in the best and most economical completion of the Project. Description of Work. a. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances; (2) Construct and adjust sanitary sewer, manholes and appurtenances; (3) Repair existing pavement affected; (4) Furnish and install all subsidiary items as necessary to complete the project; (5) Perform testing as specified on installed lines; and (6) Clean-up project area upon completion. a. Execute cutting (including excavating and backfilling), fitting or patching of the work required to: (1) Make several parts fit properly. (2) Uncover work to provide for installation of ill-timed work. (3) Remove and replace defective work. (4) Remove and replace work not conforming to requirements of the contract documents. (5) Remove samples of installed work as specified for testing. (6) Install specified work in existing construction. b. In addition to contract requirements, upon written instruction of the Engineer: (1) Uncover work to provide for observation of covered work. (2) Remove samples of installed materials for testing. (3) Remove work to provide for alteration of existing work. c. Do not endanger any work by cutting or altering the work or any part of it. d. Do not cut or alter the work of another Contractor without written consent by the Engineer. e. Prior to cutting which affects structural safety of the project, or the work of another Contractor, secure written approval by the Engineer. This section describes the excavation for all structures except pipe sewers, the backfilling around completed structures and the disposal of all excess excavated material. All operations required for the proper completion of the excavation work, including sheeting, shoring, bracing, dewatering of excavations, and compaction of backfill are included under this section. Waste material disposal consists of disposal of trees, stumps, logs, brush, roots, grass, vegetation, humus, rubbish and other objectionable matter from operations such as clearing and grubbing, excavation and grading. Unless otherwise specified, the Contractor is responsible for removal and disposal of waste material.
Award
Water / Sewer
$907,676.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2025
August 29, 2025
Lago Mar Blvd, Texas City, TX
Related To This Project
Texas City, TX
Bid Date: Aug 01 2025
Texas City, TX
Bid Date: Aug 20 2025
Texas City, TX
--
Texas City, TX
Bid Date: Sep 04 2025
Texas City, TX
Bid Date: Aug 13 2025
Texas City, TX
Bid Date: Aug 15 2025
Texas City, TX
Bid Date: Sep 04 2025
Texas City, TX
Bid Date: Sep 09 2025
Texas City, TX
--
Texas City, TX
Bid Date: Jul 29 2025
Texas City, TX
--
Texas City, TX
--
Construction Of Water, Sanitary, And Drainage Facilities In Beacon Point At Lago Mar Sec 5 - 5847896
Texas City, TX
Bid Date: Aug 01 2025
Texas City, TX
--
Texas City, TX
Bid Date: Aug 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.