Published August 22, 2025 at 8:00 PM

Updated August 23, 2025

Site work for a water / sewer project in Texas City, Texas. Completed plans call for site work for a water / sewer project.

Each Bid must be accompanied by a Bid bond or a certified or cashiers check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. The deadline to ask questions is 9/02/2025 12:00 AM CST If a certified or cashiers check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashiers check within one (1) business day of receipt of the bid opening. The successful bidder, if any, will be the responsible bidder, which in the Boards judgment will be most advantageous to the District and result in the best and most economical completion of the Project. Description of Work. a. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances; (2) Construct and adjust sanitary sewer, manholes and appurtenances; (3) Repair existing pavement affected; (4) Furnish and install all subsidiary items as necessary to complete the project; (5) Perform testing as specified on installed lines; and (6) Clean-up project area upon completion. a. Execute cutting (including excavating and backfilling), fitting or patching of the work required to: (1) Make several parts fit properly. (2) Uncover work to provide for installation of ill-timed work. (3) Remove and replace defective work. (4) Remove and replace work not conforming to requirements of the contract documents. (5) Remove samples of installed work as specified for testing. (6) Install specified work in existing construction. b. In addition to contract requirements, upon written instruction of the Engineer: (1) Uncover work to provide for observation of covered work. (2) Remove samples of installed materials for testing. (3) Remove work to provide for alteration of existing work. c. Do not endanger any work by cutting or altering the work or any part of it. d. Do not cut or alter the work of another Contractor without written consent by the Engineer. e. Prior to cutting which affects structural safety of the project, or the work of another Contractor, secure written approval by the Engineer. This section describes the excavation for all structures except pipe sewers, the backfilling around completed structures and the disposal of all excess excavated material. All operations required for the proper completion of the excavation work, including sheeting, shoring, bracing, dewatering of excavations, and compaction of backfill are included under this section. Waste material disposal consists of disposal of trees, stumps, logs, brush, roots, grass, vegetation, humus, rubbish and other objectionable matter from operations such as clearing and grubbing, excavation and grading. Unless otherwise specified, the Contractor is responsible for removal and disposal of waste material.

Award

Water / Sewer

$907,676.00

Public - County

Site Work

21

15

2

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
5
Bidding Soon
1,970
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

August 29, 2025

Project location map

Lago Mar Blvd, Texas City, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.