BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Renovation of a manufacturing facility in Ada, Oklahoma. Completed plans call for the renovation of a manufacturing facility.

**As of August 12, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Violence Prevention Center Kitchen & Laundry Room Flooring Replacement 2016 Te Ata Drive, Chickasaw Medical Center Campus Ada, OK 74820 If you have any questions, please email Angie.White@chickasaw.net or by phone (580) 272-2657 SCOPE OF WORK: The scope of this project involves the removal of the existing flooring and base in the kitchen, pantry, dishwasher area, custodial room, and laundry room, followed by the installation of Crossville Cross-Tread tile and tile base. The current flooring is Vinyl Composition Tile (VCT), and it appears to have a moisture problem that is causing it to deteriorate, detach, and come apart. This process will require the strategic relocation of kitchen and laundry room equipment. If the equipment must be removed entirely to facilitate the work, the contractor will need to provide a storage container to hold the equipment until the project is completed. The refrigerators can temporarily be relocated to the dining room and should remain operational during the renovation. Once the flooring installation is complete, the kitchen equipment must be reinstalled in its designated locations and tested to ensure proper functioning. A final cleaning of the area must be performed once all work is finished.

Post-Bid

Manufacturing

$55,000.00

Public - Federal

Renovation

9

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
62
Bidding Soon
672
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

September 1, 2025

Project location map

2016 Te Ata Dr, Ada, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.