Published October 9, 2025 at 8:00 PM
Updated October 10, 2025
Site work for a water / sewer project in Trinity, Florida. Completed plans call for site work for a water / sewer project.
Seven Springs Utility System Mitchell Boulevard Relief Force Main and Related Improvements The Successful Bidder shall be required to fully complete all Work to be performed pursuant to this invitation to bid within 300 calendar days from and after the Commencement Date specified in the Notice to Proceed Each bid submitted via shall include a photocopy/PDF copy of a certified or cashiers check or a Bid Bond in an amount not less than five percent (5%) of the total Bid The successful Bidder shall be required to furnish the necessary Performance and Payment Bonds, as prescribed in the General Conditions of the Contract Documents. All Bid Bonds, Performance and Payment Bonds The FGUA reserves the right to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents, and to postpone the award of the contract for a period of time which, however, Question Deadline 08/12/2025 All questions about the meaning or intent of the Bidding Documents shall be submitted to the OWNER in writing. To receive consideration, questions must be emailed to the OWNER and ENGINEER at least ten calendar days prior to the date for the opening of Bids. Interpretations or clarifications considered necessary by the OWNER or ENGINEER in response to such questions will be issued by Addenda via the Demand Star website (demandstar.com) to all parties recorded by the OWNER as having received the Bidding Documents for receipt not later than five (5) days prior to the date for the opening of Bids 1. The Contractor shall furnish all labor, superintendence, materials, plant power, light, heat, fuel, water, tools, appliances, equipment, supplies, and means of construction necessary for proper performance and completion of the Work. The Contractor shall obtain and pay for all necessary local building permits. The Contractor shall perform and complete the Work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Engineer and in strict accordance with the Contract Documents. The Contractor shall clean up the Work and maintain it during and after construction, until accepted, and shall do all Work and pay all costs incidental thereto. He shall repair or restore all structures and property that may be damaged or disturbed during performance of the Work. 2. The cost of incidental work described in these Project Requirements for which there are no specific Contract Items shall be considered as part of the general cost of doing the Work and shall be included in the prices for the various Contract Items. No additional payment will be made therefor. 3. The Contractor shall provide and maintain such modern plant, tools, and equipment as may be necessary, in the opinion of the Engineer, to perform in a satisfactory and acceptable manner all the Work required by this Contract. Only equipment of established reputation and proven efficiency shall be used. The Contractor shall be solely responsible for the adequacy of his workmanship, materials, and equipment, prior approval of the Engineer notwithstanding.
Award
Water / Sewer
$1,160,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2025
October 20, 2025
Mitchell Blvd, Trinity, FL
Related To This Project
Trinity, FL
Bid Date: Apr 30 2025
Trinity, FL
Bid Date: Apr 01 2025
Trinity, FL
--
Trinity, FL
Bid Date: Aug 22 2024
Trinity, FL
Bid Date: Dec 17 2020
Trinity, FL
Bid Date: Jan 26 2024
Trinity, FL
Bid Date: Jun 21 2022
Trinity, FL
Bid Date: Jan 14 2022
Trinity, FL
Bid Date: Sep 04 2023
Trinity, FL
Bid Date: Sep 17 2023
Trinity, FL
Bid Date: Jan 24 2022
Trinity, FL
Bid Date: Dec 16 2021
Trinity, FL
Bid Date: May 03 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.