BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2025 at 8:00 PM

Updated July 22, 2025

Renovation of a mixed-use development in Fullerton, California. Conceptual plans call for the renovation of a educational facility.

This project will improve the second, third, and sixth floors of the Pollak Library South (#5A) in accordance with the systemwide Library of the Future (LOFT) initiative. The overall goal is to adapt Pollak Library (411,000 GSF built in 1964 and 1995) to 21st century library practices and methods, emphasizing student learning and digital resources over managing the formerly paper-based archive of human knowledge. The project scope is in accordance with the guidance of the LOFT consultant. As of July 21, 2025 ,This project is included in the State's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Educational

$115,688,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
3
Bidding Soon
2,094
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

800 N State College Blvd, Fullerton, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.