BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2025 at 8:00 PM

Updated October 3, 2025

Site work for a water / sewer project in Mobile, Alabama. Completed plans call for site work for a water / sewer project.

The work consists of providing bonds, labor, materials, equipment, and supervision necessary for the pier replacement and relieving platform upgrade work at Pier B South. The major components of the Base Bid work include demolition and legal disposal of the existing pier (to Bent 74), fender system, relieving platform concrete slab-on-grade, asphalt and railroad tracks, disconnection of active existing utilities and reconnection after new pier is installed, installation of new concrete cap on existing steel sheet pile wall, installation of structural fill in voids underneath the relieving platform, repairs to existing warehouse concrete, installation of new augercast piles for new concrete slab-on-grade relieving platform, new restroom and traffic bollards, new pile-supported concrete pier with fenders, mooring bollards and utility vaults, and a single-rail elevated track, landside rail that ties into the existing rail line and associated approach slab and asphalt. A Guarantee will be required with each bid as follows: At least five (5%) percent of the amount bid, but in no event more than Ten Thousand ($10,000) Dollars, shall be furnished in the form of a certified check or bid bond payable to the Alabama State Port Authority. A Performance Bond in an amount not less than the sum bid will be required at the signing of the contract and, in addition, a bond in an amount not less than One Hundred (100%) percent of the contract price, insuring payment of all labor and material. All questions about the meaning or intent of the Contract Documents shall be submitted in writing to the Mott MacDonald Project Manager, Lowry Denty, at lowry.denty@mottmac.com, on or before Wednesday, August 20, 2025.

Award

Water / Sewer

$83,981,163.00

Public - County

Site Work

232

31

2

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
40
Bidding Soon
739
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2025

October 10, 2025

Project location map

Multiple Locations, Mobile, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.