Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 3, 2025 at 8:00 PM
Updated November 27, 2025
Site work and outdoor lighting for a road / highway in Exeter, California. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.
Streetlight Installation Project Questions must be received no later than Wednesday, July 30, 2023. A certified check, cashier's check, or bidder's bond in the amount often percent (10%) of the bid made payable to the City of Exeter will be required to accompany each proposal. Background: The City of Exeter desires to establish a contract with a Contractor to install City furnished streetlights on existing foundations. The awarded Contractor shall be provided an Authorization to Proceed to begin work. Upon authorization, the Contractor shall complete the work within 30 working days unless extenuating circumstances exist. Contractor's Responsibilities:Contractor shall provide all mobilization and demobilization, equipment, labor, tools, materials and supervision to remove and dispose of existing equipment, install new equipment, and complete work in a timely fashion. All work to be done shall have prior approval of the City of Exeter. Contractor will also be responsible for obtaining any necessary permits that may be required for the project and scheduling for inspections prior to beginning any work. A no-fee City of Exeter Encroachment Permit will be provided for the work and the traffic control. All safety practices shall be followed according to OSHA standards. Contractor shall be responsible for cleanup and disposal of all material around site area on a daily basis. All work shall be commensurate with the highest professional standards and shall be performed with the public's safety in mind by a licensed contractor. The Contractor shall begin work within Ten (10) days after receiving notice that the contract has been approved (Notice to Proceed) and shall diligently prosecute the same to final completion of the total project Thirty (30) working days after that work begins (mobilization)
Occupancy
Roads / Highways
$76,770.00
Public - City
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2025
September 3, 2025
Multiple Locations, Exeter, CA
Related To This Project
Exeter, CA
Bid Date: Sep 30 2025
Exeter, CA
Bid Date: May 27 2025
Exeter, CA
Bid Date: Mar 05 2025
Exeter, CA
Bid Date: Dec 04 2024
Exeter, CA
--
Exeter, CA
Bid Date: Oct 03 2024
Exeter, CA
Bid Date: Mar 13 2024
Exeter, CA
Bid Date: Mar 06 2024
Exeter, CA
Bid Date: Feb 16 2024
Exeter, CA
--
Exeter, CA
--
Exeter, CA
--
Exeter, CA
--
Exeter, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
