BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2025 at 8:00 PM

Updated August 16, 2025

Site work and paving for a mixed-use development in Wroxeter, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Maitland Valley Conservation Authority (MVCA) is seeking the services of a qualified Asphalt paving contractor to remove existing asphalt surfaces, prepare base, and install new asphalt surface in desired locations at the MVCA Administration office located at 1093 Marietta Street, Wroxeter, Ontario. The contractor is to complete all aspects of the project including removal of existing asphalt, removal of all waste or surplus materials from site, site and base preparation, and installation of new asphalt surface and site restoration following the owners' objectives and requirements. Document can be obtained from https://mvca.bidsandtenders.ca/ Question Deadline: Fri Aug 8, 2025 12:00:00 PM (EDT)

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2025

September 12, 2025

Project location map

1093 Marietta St, Wroxeter, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.