BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 8, 2025 at 7:00 PM

Updated November 9, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Hounsfield, New York. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for paving for a bridge / tunnel.

The objectives of the project include 1. Retain crossing location at or in close proximity to the existing crossing. 2. Restore the crossing to a general recommendation of 5 (a rating of 5 means that the crossing remains in fully functional and in a fair condition) or greater. 3. Provide a design life of at least 70 years for the replacement or rehabilitation of the crossing (or extend the service life required to achieve the design life of the existing crossing by repairs, including invert paving), using measures that minimize the life cycle cost of the structure. 4. Address geometric and operational deficiencies to improve safety, traffic flow and facilitate traffic operations 5. Hydraulic Resiliency - design the crossing to accommodate the vertical flood elevation and corresponding flows from the applicable recommendations in the NYS Flood Risk Management Guidelines and HDM Ch. 8.6.1.1. 6. Environmental Stewardship - provide adequate aquatic organism passage (AOP) at the crossing. Design replacement crossings to provide AOP that equates to the highest level or next to highest level AOP score for the methodology used. GOALS FOR PARTICIPATION OF MINORITIES 2.5% The goal for the participation of women is 6.9% This work shall consist of furnishing, placing, grading, compacting, and trimming shoulder backup material of the type indicated adjacent to shoulders to the lines, grades, and locations indicated in the contract documents or to the lines, grades, and locations directed by the Engineer, in accordance with these specifications and details shown in the plans. Fa Proj , Jefferson Co., Bridge Replacement - Ny Route 3, Town of Hounsfield., Bid Deposit: 5% of Bid (~ $125,000.00) , Goals: Dbe: 4.00% Every bid must be accompanied by a bid bond, certified check or bank cashier's check payable to the NYS Department of Transportation, in the sum of the amount shown on the proposal title page. Bonds must be on form CONR 391. Electronic bids must include an electronic bid bond. Project related technical questions or comments must be submitted through the Construction Contracting section of the NYSDOT Business Center on the NYSDOT website Contract administration or procurement questions may be submitted either through the website or directed to Robert Kitchen, or the Assistant Director/Director of the Office of Contract Management, (518) 457-2124. If you have questions please contact: Jarrod Radley, PIN-711518 NYSDOT Region 7 Public Information Officer 317 Washington Street Watertown, NY 13601 Phone: 315-785-2218 NYDOT - Bridge Replacement - NY Route 3

Post-Bid

Bridges / Tunnels

$2,150,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

167

16

8

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
83
Bidding Soon
1,031
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2025

January 5, 2026

Project location map

State Rte 3, Hounsfield, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.