Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 23, 2025 at 8:00 PM
Updated September 24, 2025
Site work for a water / sewer project in Waco, Texas. Completed plans call for site work for a water / sewer project.
**As of September 23rd, 2025 , this project has not yet been awarded. The project is expected to be awarded on November 4th, 2025.** The City of Waco has issued this solicitation for the Speegleville Road Utility Improvements Project. The project shall generally consist of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place approximately 1,950 linear feet of 24-inch PVC C900 waterline, an approximately 1,275 linear feet horizontal directional drilling crossing of the Middle Bosque River utilizing 42-Inch HDPE casing piping and 30-Inch HDPE waterline piping, approximately 1,530 linear feet of 18-inch PVC gravity wastewater line, manholes, approximately 1,600 linear feet horizontal directional drilling crossing of the Middle Bosque River utilizing 16-Inch HDPE force main, temporary by-pass system, abandonment of existing waterlines/wastewater lines, surface replacement, road repair and all necessary components as shown on the project drawings and as specified herein. This RFB requires prequalification of General Contractors and Horizontal Directional Drilling subcontractors. General Contractors are required to submit the questionnaire and other required information along with the prequalification application of any Horizontal Directional Drilling Subcontractor(s) the General Contractor would like the City to consider, which will then be reviewed by the City and/or its agents. Based on the criteria set out in this solicitation, bids will only be accepted from a General Contractor if said bid involves a prequalified Horizontal Directional Drilling Subcontractor. Any bid which fails to include a prequalified Horizontal Directional Drilling Subcontractor will be returned as non-responsive. Questions Due Date: Sep 3rd 2025, 5:00 PM CDT Online Portal Bid date changed from 12 August to 16 September 2025 as per QA
Bid Results
Water / Sewer
$7,435,257.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 16, 2025
November 17, 2025
Speegleville Rd, Waco, TX
Related To This Project
Waco, TX
Bid Date: Sep 03 2025
Waco, TX
Bid Date: Aug 20 2025
Waco, TX
Bid Date: Sep 04 2025
Waco, TX
Bid Date: Sep 03 2025
Waco, TX
Bid Date: Aug 20 2025
Waco, TX
--
Waco, TX
--
Waco, TX
Bid Date: Sep 16 2025
Waco, TX
Bid Date: Aug 11 2025
Waco, TX
Bid Date: Jul 22 2025
Waco, TX
Bid Date: Jul 22 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
