BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Site work for a water / sewer project in Waco, Texas. Completed plans call for site work for a water / sewer project.

**As of September 23rd, 2025 , this project has not yet been awarded. The project is expected to be awarded on November 4th, 2025.** The City of Waco has issued this solicitation for the Speegleville Road Utility Improvements Project. The project shall generally consist of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place approximately 1,950 linear feet of 24-inch PVC C900 waterline, an approximately 1,275 linear feet horizontal directional drilling crossing of the Middle Bosque River utilizing 42-Inch HDPE casing piping and 30-Inch HDPE waterline piping, approximately 1,530 linear feet of 18-inch PVC gravity wastewater line, manholes, approximately 1,600 linear feet horizontal directional drilling crossing of the Middle Bosque River utilizing 16-Inch HDPE force main, temporary by-pass system, abandonment of existing waterlines/wastewater lines, surface replacement, road repair and all necessary components as shown on the project drawings and as specified herein. This RFB requires prequalification of General Contractors and Horizontal Directional Drilling subcontractors. General Contractors are required to submit the questionnaire and other required information along with the prequalification application of any Horizontal Directional Drilling Subcontractor(s) the General Contractor would like the City to consider, which will then be reviewed by the City and/or its agents. Based on the criteria set out in this solicitation, bids will only be accepted from a General Contractor if said bid involves a prequalified Horizontal Directional Drilling Subcontractor. Any bid which fails to include a prequalified Horizontal Directional Drilling Subcontractor will be returned as non-responsive. Questions Due Date: Sep 3rd 2025, 5:00 PM CDT Online Portal Bid date changed from 12 August to 16 September 2025 as per QA

Bid Results

Water / Sewer

$7,435,257.00

Public - City

Site Work

93

20

29

8

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
47
Bidding Soon
1,576
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2025

November 17, 2025

Project location map

Speegleville Rd, Waco, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.