BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2025 at 8:00 PM

Updated August 16, 2025

Renovation of a multi-residential development in Toronto, Ontario. Completed plans call for the renovation of a multi-residential development.

TCHC is seeking for the provision of Interior Common Area Painting services at Various Locations. A Proponent may bid on one or all locations. TCHC will be awarding each location separately to the lowest total priced Quotation for that location. Question Deadline 08/01/2025 at 4:00 PM ET Online Portal 145 Mutual St. 1) Common Area: a) Paint walls completely. (Stucco textured) b) Paint ceilings completely. c) Paint baseboard completely. d) Paint unit doors and trim completely. Exterior Face only. Include key holder. e) Paint service doors completely. f) Paint all levels in basement of building including corridors, stairwells, doors and frames. g) Paint first floor exterior exit doors where required. h) Paint all elevator doors and frames. i) Paint laundry rooms, garbage chute rooms and recreation rooms if applicable. j) Paint service doors and trim completely on rooftops and underground garage if applicable. 2) Stairwells: a) Paint stairwell ceilings completely. b) Paint stairwell walls completely. c) Paint stairwell doors completely. Both Sides. d) Paint stairwell door trim completely. Both sides. e) Paint baseboard as required. VIF. f) Paint stair stringers completely. 3) Surface Preparation: o Scrape. (As required) VIF. o Sand. (As required) o Plaster. (As required) VIF. o Drywall repairs including corner bead. (As required) VIF. 4) Prime: o All surfaces. o Include graffiti cover-up. 5) Colour Finishes: Match existing colour of walls, ceiling, doors, frames, and trim. 100% acrylic paint. Ceilings will be white in all areas. Doors, windows, sills, baseboards and trims will be painted semi-gloss. Work to include 1-coat primer, with 2-coats of finish. Leave 5-gallon container of wall paint, with site staff. (VIF) Verify in field. Acceptable Paint Manufacturers 1) Akzo Nobel (Dulux Paints) 2) Benjamin Moore 3) Sherwin Williams 4) Colour Your World 5) Pittsburgh Paints 6) Pratt & Lambert All paint must be 100% acrylic. 295 Shuter St. 1) Stairwells: a) Paint stairwell ceilings completely. b) Paint stairwell walls completely. c) Paint stairwell doors completely. Both Sides. d) Paint stairwell door trim completely. Both sides. e) Paint baseboard as required. VIF. f) Paint stair stringers completely. 2) Surface Preparation: o Scrape. (As required) VIF. o Sand. (As required) o Plaster. (As required) VIF. o Drywall repairs including corner bead. (As required) VIF. 3) Prime: o All surfaces. o Include graffiti cover-up. 4) Colour Finishes: Match existing colour of walls, ceiling, doors, frames, and trim. 100% acrylic paint. Ceilings will be white in all areas. Doors, windows, sills, baseboards and trims will be painted semi-gloss. Work to include 1-coat primer, with 2-coats of finish. Leave 5-gallon container of wall paint, with site staff. (VIF) Verify in field. Acceptable Paint Manufacturers 1) Akzo Nobel (Dulux Paints) 2) Benjamin Moore 3) Sherwin Williams 4) Colour Your World 5) Pittsburgh Paints 6) Pratt & Lambert All paint must be 100% acrylic. 40 Lower River St. 1) Common Area: a) Paint walls completely. b) Paint ceilings completely. c) Paint baseboard completely. d) Paint unit doors and trim completely. Exterior Face only. Include key holder. e) Paint service doors completely. f) Paint all levels in basement of building including corridors, stairwells, doors and frames. g) Paint first floor exterior exit doors where required. h) Paint all elevator doors and frames. i) Paint laundry rooms, garbage chute rooms and recreation rooms if applicable. j) Paint service doors and trim completely on rooftops and underground garage if applicable. 2) Stairwells: a) Paint stairwell ceilings completely. b) Paint stairwell walls completely. c) Paint stairwell doors completely. Both Sides. d) Paint stairwell door trim completely. Both sides. e) Paint baseboard as required. VIF. f) Paint stair stringers completely. 3) Surface Preparation: o Scrape. (As required) VIF. o Sand. (As required) o Plaster. (As required) VIF. o Drywall repairs including corner bead. (As required) VIF. 4) Prime: o All surfaces. o Include graffiti cover-up. 5) Colour Finishes: Match existing colour of walls, ceiling, doors, frames, and trim. 100% acrylic paint. Ceilings will be white in all areas. Doors, windows, sills, baseboards and trims will be painted semi-gloss. Work to include 1-coat primer, with 2-coats of finish. Leave 5-gallon container of wall paint, with site staff. (VIF) Verify in field. Acceptable Paint Manufacturers 1) Akzo Nobel (Dulux Paints) 2) Benjamin Moore 3) Sherwin Williams 4) Colour Your World 5) Pittsburgh Paints 6) Pratt & Lambert All paint must be 100% acrylic.

Post-Bid

Multi-Residential

$50,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
483
Active Projects
197
Bidding Soon
4,860
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

September 15, 2025

Project location map

Multiple Locations, Toronto, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.