Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 29, 2025 at 8:00 PM
Updated August 30, 2025
Renovation of an educational facility in Dighton, Massachusetts. Completed plans call for the renovation of a educational facility.
K9 Center Roof, Fascia Replacements, Window and Door Trim Replacement and Vinyl Siding. Bristol County Agricultural High invites bids from qualified vendors for removal and disposal of existing K9Center Roof, Fascia, Window and Door Trim Removal and Replacement and Installation of New Vinyl Siding. Bids are subject to MGL c149 A-J and to prevailing wage rates as required by MGL c149 s26 to 27D. Removal: Complete removal of existing roofing materials, including shingles, underlayment, flashing, drip edge, and any damaged sheathing or substructures. Preparation: Nail down any loose nails in the roof sheathing. Prepare the roof surface to receive new roofing materials. Contingency cost per sqft for repairs Installation: Install new underlayment (synthetic underlayment) Install new ice and water shield (as per local code and manufacturer recommendations). Install new drip edge flashing. Install new flashing around chimneys, vents, and other roof penetrations. Replace any damaged sheathing or substructures. Install pipe boots and chimney boots. Vent roof according to 780 CMR Flat roof Clean and restore existing pvc membrane with flat roof coating (urethane-silicone, white) Siding Scope of Work: Removal: Complete removal of existing siding materials. Complete removal of window and door trim Preparation: Prepare the wall surface for new siding installation. This may include repairs to the wall sheathing, installation of house wrap, or other weatherproofing measures. Contingency cost per sqft for repairs Installation: Install new siding materials (vinyl cedar impressions, Color to match Dairy Barn gray). Install new trim and accessories. Ensure proper clearances between siding and other elements like roofing. Install new pvc trim around doors Siding to abutt to windows Final Touches: Caulking and sealing of all seams and edges. Clean up of the work area. Soffit and Gutter system Color: Elevate's (formerly Firestone) Charcoal Gray Remove existing gutters Install new fascia and Trim at rakes and gables (PVC assembly) Install new gutter system with splash blocks at downspouts (Match existing campus gutters)
Award
Educational
$150,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 13, 2025
September 2, 2025
135 Center St, Dighton, MA
Related To This Project
Dighton, MA
Bid Date: Aug 26 2025
Dighton, MA
Bid Date: Oct 07 2025
Dighton, MA
Bid Date: Nov 04 2025
Dighton, MA
Bid Date: Oct 28 2025
Dighton, MA
Bid Date: Nov 18 2025
Dighton, MA
Bid Date: Nov 18 2025
Dighton, MA
Bid Date: Dec 09 2025
Dighton, MA
Bid Date: Aug 05 2025
Dighton, MA
Bid Date: Jul 15 2025
Dighton, MA
Bid Date: Jul 15 2025
Dighton, MA
Bid Date: Jun 24 2025
Dighton, MA
--
Dighton, MA
Bid Date: May 13 2025
Dighton, MA
Bid Date: May 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
