Site work and new construction of a mixed-use development in Yorkville, Ohio. Completed plans call for the construction of a power facility; for site work for a power facility; and water / sewer project.
Description of work: The Project is in the advanced stages of design and permitting, with construction anticipated to begin in January 2026 and a target commercial operation date of July 2028. The major elements of work include: Installation of site civil works, including cofferdams and SOE walls Construction of a new reinforced concrete powerhouse adjacent to the existing fix-crest weir Installation of ancillary mechanical and electrical systems Development of intake and tailrace channels Construction of a new 12.47kV to 69kV substation, including the installation of a prefabricated control building New 12.47kV and 69kV overhead transmission line construction Associated site development and infrastructure improvements SBE: None WAGE RATES: Please include the cost of the posted prevailing wages in your work. CONSTRUCTION SCHEDULE: Please provide scheduled duration for subcontracted work and lead times on all quoted materials. Performance & Payment Bond may be required. Indicate Bond Rate % with Bid.
Post-Bid
Hydroelectric Power Generation
$200,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 5, 2025
January 1, 2026
230 Deep Run Rd, Yorkville, OH
Related To This Project
Yorkville, OH
--
Yorkville, OH
Bid Date: Dec 04 2024
Yorkville, OH
Bid Date: May 20 2024
Yorkville, OH
Bid Date: Mar 22 2024
Willowick, OH
Bid Date: Aug 28 2025
Wapakoneta, OH
Bid Date: Aug 21 2025
Gates Mills, OH
Bid Date: Aug 15 2025
Hebron, OH
Bid Date: Aug 29 2025
Athens, OH
Bid Date: Aug 19 2025
Steubenville, OH
Bid Date: Aug 28 2025
Hamilton, OH
Bid Date: Sep 10 2025
Cincinnati, OH
Bid Date: Aug 20 2025
Youngstown, OH
Bid Date: Jul 30 2025
Conneaut, OH
Bid Date: Aug 12 2025
Massillon, OH
Bid Date: Sep 03 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.