BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2025 at 8:00 PM

Updated September 6, 2025

Site work for a water / sewer project in Schenectady, New York. Completed plans call for site work for a water / sewer project.

OPWDD Issues Request for Quote (RFQ) 24 July 2025 Questions regarding the bid process should be submitted via email to: Michael.j.keller@opwdd.ny.gov. Please call or email Nathan Pannone, OPWDD Plant Superintendent, Telephone: 518- 388-0345; email: Nathan.a.pannone@opwdd.ny.gov or John Askew, Maintenance Supervisor, Telephone: 518-338-0343; email: john.l.askew@opwdd.ny.gov or William Batcher, Maintenance Supervisor, 518-388-0371, email: William.h.batcher@opwdd.ny.gov with questions regarding the Site Visit or directions to the project site. Statement of Work The Contractor will excavate, remove, and replace eroded waste (sewer) pipe in Building 9, located on the Office for People With Developmental Disabilities (OPWDD) O.D. Heck Campus, 500 Balltown Road, Schenectady, NY 12304 for OPWDD Capital District DDSOO. The sewer and storm drainpipe underneath Building 9 needs replacement. The Contractor will provide all labor and materials necessary to complete the work in a professional manner according to scope of work. Work is to be completed within 40 working days of award, unless modified below. This is a NYS Public Works project, and prevailing wages are to be paid, and Certified Payrolls must be submitted at time of completion. All tools must be always controlled, and debris, tools, and materials secured and stored at the end of each workday. Upon completion of waste pipe replacement, and before the removal of equipment, the Contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent or their representative. The scope of work is depicted and highlighted in Exhibit A - Diagram. Detailed Specifications This project is for the replacement of a 60-foot section of decomposing sewer branch line, up to 240 feet of the sewer main, and up to 240 feet of storm drain. The pipes are believed to be 4" pipe buried 3 to 4 feet underneath a concrete slab. The sewer main serves the second floor and connects with a kitchen and 3 bathrooms on the first floor. The sewer main and storm drain will require evaluation to determine the length needed for replacement. Scope of work includes, but is not necessarily limited to the following: 1. Confirm locations of pipes via drawings and camera radio signal. 2. Cut concrete slab and excavate pipe. 3. Prepare trench, through additional filler and/or compaction to provide a solid bed, suitable for pipe to be sloped at a minimum 1/8 inch per foot. 4. Install properly sized pipe conforming to material requirements of NYS Plumbing Code, Table 702.3. 5. Reconnect incoming branch lines from bathrooms, kitchen, and other sources. 6. Perform a drainage and vent water test, as per Section 312.2 in the NYS Plumbing Code (2020), to confirm installed pipe and fittings are not leaking, and pipe is sloped properly. 7. Fill trench and repair concrete slab. 8. Project to be completed following NYS Plumbing Code (2020). 9. No fuel burning equipment can be used inside the building. 10. Special Note: This is an occupied building, and the timeframe will have to be scheduled for shutdown. And the final connections will have to be done on the weekend

Post-Bid

Water / Sewer

$1,200,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
180
Bidding Soon
2,055
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

October 27, 2025

Project location map

500 Balltown Rd, Schenectady, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.