Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 5, 2025 at 8:00 PM
Updated September 6, 2025
Site work for a water / sewer project in Schenectady, New York. Completed plans call for site work for a water / sewer project.
OPWDD Issues Request for Quote (RFQ) 24 July 2025 Questions regarding the bid process should be submitted via email to: Michael.j.keller@opwdd.ny.gov. Please call or email Nathan Pannone, OPWDD Plant Superintendent, Telephone: 518- 388-0345; email: Nathan.a.pannone@opwdd.ny.gov or John Askew, Maintenance Supervisor, Telephone: 518-338-0343; email: john.l.askew@opwdd.ny.gov or William Batcher, Maintenance Supervisor, 518-388-0371, email: William.h.batcher@opwdd.ny.gov with questions regarding the Site Visit or directions to the project site. Statement of Work The Contractor will excavate, remove, and replace eroded waste (sewer) pipe in Building 9, located on the Office for People With Developmental Disabilities (OPWDD) O.D. Heck Campus, 500 Balltown Road, Schenectady, NY 12304 for OPWDD Capital District DDSOO. The sewer and storm drainpipe underneath Building 9 needs replacement. The Contractor will provide all labor and materials necessary to complete the work in a professional manner according to scope of work. Work is to be completed within 40 working days of award, unless modified below. This is a NYS Public Works project, and prevailing wages are to be paid, and Certified Payrolls must be submitted at time of completion. All tools must be always controlled, and debris, tools, and materials secured and stored at the end of each workday. Upon completion of waste pipe replacement, and before the removal of equipment, the Contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent or their representative. The scope of work is depicted and highlighted in Exhibit A - Diagram. Detailed Specifications This project is for the replacement of a 60-foot section of decomposing sewer branch line, up to 240 feet of the sewer main, and up to 240 feet of storm drain. The pipes are believed to be 4" pipe buried 3 to 4 feet underneath a concrete slab. The sewer main serves the second floor and connects with a kitchen and 3 bathrooms on the first floor. The sewer main and storm drain will require evaluation to determine the length needed for replacement. Scope of work includes, but is not necessarily limited to the following: 1. Confirm locations of pipes via drawings and camera radio signal. 2. Cut concrete slab and excavate pipe. 3. Prepare trench, through additional filler and/or compaction to provide a solid bed, suitable for pipe to be sloped at a minimum 1/8 inch per foot. 4. Install properly sized pipe conforming to material requirements of NYS Plumbing Code, Table 702.3. 5. Reconnect incoming branch lines from bathrooms, kitchen, and other sources. 6. Perform a drainage and vent water test, as per Section 312.2 in the NYS Plumbing Code (2020), to confirm installed pipe and fittings are not leaking, and pipe is sloped properly. 7. Fill trench and repair concrete slab. 8. Project to be completed following NYS Plumbing Code (2020). 9. No fuel burning equipment can be used inside the building. 10. Special Note: This is an occupied building, and the timeframe will have to be scheduled for shutdown. And the final connections will have to be done on the weekend
Post-Bid
Water / Sewer
$1,200,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
October 27, 2025
500 Balltown Rd, Schenectady, NY
Related To This Project
Schenectady, NY
Bid Date: Jul 31 2025
Schenectady, NY
Bid Date: Aug 14 2025
Schenectady, NY
Bid Date: Aug 27 2025
Schenectady, NY
Bid Date: Sep 05 2025
Schenectady, NY
Bid Date: Sep 04 2025
Schenectady, NY
Bid Date: Aug 14 2025
Schenectady, NY
Bid Date: Sep 11 2025
Schenectady, NY
Bid Date: Sep 18 2025
Schenectady, NY
Bid Date: Jul 31 2025
Schenectady, NY
Bid Date: Aug 21 2025
Schenectady, NY
--
Schenectady, NY
Bid Date: May 06 2021
Schenectady, NY
Bid Date: Jul 31 2025
Schenectady, NY
Bid Date: Aug 07 2025
Schenectady, NY
Bid Date: Jul 22 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
