Published September 25, 2025 at 8:00 PM
Updated September 26, 2025
Site work and paving for a road / highway in Twin City, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The work to be done consists of furnishing all materials, equipment and labor for the construction of: PART A-C (LRA Funds) The project will consist of patching, overlay with 584 tons of recycled asphalt concrete 9.5 mm Superpave, 708 gallons of bitum tack coat, restriping, traffic control and appurtenances. PART D-I (TSPLOST Funds) The project will consist of patching, overlay with 5,341 tons of recycled asphalt concrete 9.5 mm Superpave, 6,474 gallons of bitum tack coat, restriping, traffic control and appurtenances. PART J-P (GTIB Funds) The project will consist of patching, overlay with 1,726 tons of recycled asphalt concrete 9.5 mm Superpave, 2,093 gallons of bitum tack coat, restriping, traffic control and appurtenances. Time allotted for completion shall be 210 consecutive calendar days. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Twin City, in the amount of at least 5% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Twin City. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Twin City as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract The Owner reserves the right to reject any or all bids and to waive informalities. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days.
Bid Results
Roads / Highways
$1,011,495.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 29, 2025
September 29, 2025
Multiple Locations, Twin City, GA
Related To This Project
Twin City, GA
Bid Date: Dec 03 2024
Twin City, GA
--
Twin City, GA
Bid Date: Dec 15 2023
Twin City, GA
Bid Date: Nov 02 2023
Twin City, GA
Bid Date: Nov 02 2023
Twin City, GA
Bid Date: Jul 22 2022
Twin City, GA
Bid Date: Feb 24 2022
Twin City, GA
Bid Date: Feb 21 2022
Twin City, GA
Bid Date: Aug 18 2023
Twin City, GA
Bid Date: Aug 25 2023
Twin City, GA
Bid Date: Sep 21 2023
Twin City, GA
Bid Date: Mar 10 2023
Twin City, GA
Bid Date: Jul 22 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.