BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2025 at 8:00 PM

Updated September 26, 2025

Site work and paving for a road / highway in Twin City, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work to be done consists of furnishing all materials, equipment and labor for the construction of: PART A-C (LRA Funds) The project will consist of patching, overlay with 584 tons of recycled asphalt concrete 9.5 mm Superpave, 708 gallons of bitum tack coat, restriping, traffic control and appurtenances. PART D-I (TSPLOST Funds) The project will consist of patching, overlay with 5,341 tons of recycled asphalt concrete 9.5 mm Superpave, 6,474 gallons of bitum tack coat, restriping, traffic control and appurtenances. PART J-P (GTIB Funds) The project will consist of patching, overlay with 1,726 tons of recycled asphalt concrete 9.5 mm Superpave, 2,093 gallons of bitum tack coat, restriping, traffic control and appurtenances. Time allotted for completion shall be 210 consecutive calendar days. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Twin City, in the amount of at least 5% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Twin City. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Twin City as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract The Owner reserves the right to reject any or all bids and to waive informalities. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days.

Bid Results

Roads / Highways

$1,011,495.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
66
Bidding Soon
672
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2025

September 29, 2025

Project location map

Multiple Locations, Twin City, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.