BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2025 at 8:00 PM

Updated September 6, 2025

Site work for a water / sewer project in Gulfport, Florida. Completed plans call for site work for a water / sewer project.

Intersection Restoration & Seawall Replacement Questions regarding this bid should be directed to John B. Adams, Jr., P.E., Project Manager at (727) 526-9158 or Jack@ruebenclarsonconsulting.com. All proposals must be accompanied by a certified check, money order, or bid bond in the amount of ten percent (10%) of the base bid, made payable to the City of Gulfport. Which check, money order or bid bond shall guarantee that should the proposal be accepted, the bidder will, within ten (10) days after the acceptance of his proposal, enter into a contract with the City of Gulfport for the services proposed to be performed and will at that time furnish performance and payment bonds, each in the amount of 100 percent (100%) of the contract, made payable to the City of Gulfport, Florida, which bonds shall be adequate to guarantee the faithful performance of the contract. Bids may be withdrawn prior to the date of opening, but no bid may be withdrawn for a period of sixty (60) days after the date of opening bids. Bids must conform to the specifications and instruction to the Bidders. Any deviation from the specifications must be shown. Question Deadline 08/21/2025 Should a bidder find discrepancies in, or omissions from the drawings or other Contract Documents, or should he be in doubt as to their meaning, he should at once notify the Engineer The work to be performed under these contracts shall consist of the furnishing of all labor, materials, and equipment necessary to satisfactorily complete the Intersection Restoration & Seawall Replacement project including written logs and testing in accordance with these plans and specifications. All workmanship and materials shall be fully guaranteed for a period of one year after date of acceptance by the Owner. All Testing shall be paid by the Contractor. All Professional Surveying shall be paid by the Contractor. The City reserves the right to reject any or all bids, to accept bids in any order or combination, to re- advertise, to accept the bid, which is deemed in the best interest of the City, and to waive any informalities or technicalities on bids. The decision as to what constitutes a technicality shall rest solely with the City of Gulfport, Florida. This request for proposals and all proposals submitted are subject to the City ordinances.

Award

Water / Sewer

$429,975.00

Public - City

Site Work

8

9

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
85
Bidding Soon
1,879
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

September 26, 2025

Project location map

To Be Determined, Gulfport, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.