BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 2, 2025 at 8:00 PM

Updated September 4, 2025

Renovation of a clubhouse / community center in Barnstable, Massachusetts. Completed plans call for the renovation of a clubhouse / community center.

Project Description: The project consists of the removal and replacement of two HVAC ERV units. Both existing units are roof mounted. One new unit will be installed on the existing roof curb near the gymnasium. The second unit will be installed on grade adjacent to the ice rink. Work will include removal and replacement of interior ceiling finishes to allow for installation of new HVAC duct work and piping. The work will include all operations necessary to deliver the building(s) and ancillary on and off site amenities in a fully installed and operable condition including all utility and site work and obtaining all necessary licenses, permits, and certificates. The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: Construction related to the removal and replacement of two HVAC ERV units. Existing units are on the roof. One new unit will be located on an existing roof area and the second unit located on grade next to the existing building. The Town of Barnstable's Representative for this project and Owner's Project Manager will be: Mark Marinaccio, AIA, Town Architect for the Town of Barnstable. Once the project contract is signed, all project questions, shop drawings, samples and requirements for approvals shall be directed to: Town of Barnstable Attn: Mark Marinaccio, AIA, Town Architect Department of Public Works Administration and Technical Support 800 Pitchers Way Hyannis, MA 02601 Phone: (508) 790-6323 Fax: (508) 790-6344 Email: mark.marinaccio@town.barnstable.ma.us Filed Sub Bidders must be certified by the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the categories of Acoustic Tile, Painting, Plumbing, HVAC and Electrical. Work will include removal and replacement of interior ceiling finishes to allow for installation of new HVAC duct work, piping, and control wiring, Pre-Engineered metal building framing, Demolition of existing door and installation of new in a different location, Light gauge metal framing, Sheathing and air barrier, Carpentry, waterproofing, dampproofing, caulking, Interior finishes, Mechanical, plumbing and electrical, and Sitework. Question Deadline 08/13/2025 at 12:00 PM ET

Post-Bid

Clubhouse / Community Centers

$730,000.00

Public - City

Renovation

42

18

45

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
193
Bidding Soon
2,664
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2025

September 22, 2025

Project location map

141 Bassett Ln, Barnstable, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.