Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 10, 2025 at 8:00 PM
Updated September 11, 2025
Site work and paving for a mixed-use development in Clinton, Utah. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
The project consists of furnishing all labor and materials for the removal of the existing secondary connections and installing Owner-supplied boxes, and lids. The project will be installed within a one-year time period. The total number of meters is approximately 2,500, but will vary depending on field conditions. Also included in the project is excavation to fully expose the existing service lateral (which may be the entire stretch between curb and sidewalk), the removal of the existing service, imported gravel material, installation of the meter box 4 inches from the back of curb, connecting to existing pipes (even adjusting homeowner's shutoff valve if needed to allow everything to fit properly without excessive fittings), and restoring landscaping/site as it was prior to the project. If the existing compression fitting causes the pit to be greater than 4 inches from back of curb, then the contractor is responsible for the removal and replacement of the compression fitting and installing the new fitting. Est. Completion Date: Sept. 1, 2026
Award
Sidewalks / Parking Lot
$1,425,270.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2025
October 13, 2025
Multiple Locations, Clinton, UT
Related To This Project
Clinton, UT
Bid Date: Sep 12 2025
Clinton, UT
Bid Date: Nov 25 2025
Clinton, UT
Bid Date: Jun 17 2025
Clinton, UT
Bid Date: Apr 29 2025
Clinton, UT
Bid Date: Apr 10 2025
Clinton, UT
--
Clinton, UT
--
Clinton, UT
--
Clinton, UT
Bid Date: Feb 04 2025
Clinton, UT
--
Clinton, UT
Bid Date: Mar 03 2021
Clinton, UT
--
Clinton, UT
--
Clinton, UT
Bid Date: Jun 27 2024
Clinton, UT
Bid Date: May 22 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
