BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work for a water / sewer project in Omaha, Nebraska. Completed plans call for site work for a water / sewer project.

The Work Consists Essentially of the Following Estimated Quantities:approximate Quantitiesitemno.descriptionquantityunit1.remove Pipe Plug2ea2.construct 24" Rcp, Class Iii781lf3.construct 36" Rcp, D(0.01) = 1,35037lf4.construct 54" I.d. Storm Manhole (2)14vf5.construct 60" I.d. Storm Manhole (3)22vf6.construct 72" I.d. Storm Manhole (1)9vf7.construct 24" Storm Sewer Pipe Plug2ea8.construct 36" Storm Sewer Pipe Plug1ea9.construct 36" Storm Sewer Concrete Collar1ea10.install Curb Inlet Protection4ea11.install Silt Fence300lf12.install Seeding and Matting2,750sy13.construct Curb Inlet - Type I2ea14.construct 18" Rcp, Class Iii16lf15.install External Frame Sealon Storm Sewer Manhole1ea16.remobilization1lsthe Amount of the Engineer's Estimate of the Cost of Said Improvements (Exclusive Ofengineering, Fiscal, Legal, Interest, Easement Acquisition, and Miscellaneous Costs) All Proposals Must Be Submitted on Bid Forms Furnished by E & a Consulting Group, Inc., Andmust Be Accompanied by an Original Bid Bond or a Certified Check in the Amount Not Less Than$7,740.00 Made Payable to the Treasurer of Sanitary and Improvement District 629 as Securitythat the Bidder to Whom the Contract May Be Awarded Will Enter Into a Contract to Build Theimprovements in Accordance With This Notice to Contractor and Will Give a Contract and Maintenancebond in the Amount of 100% of the Total Contract Price, All as Provided in the Specifications. Bidbonds Must Be Executed by a Duly Licensed Corporate Surety. Checks Accompanying Proposals Notaccepted Shall Be Returned to the Bidders No Bidder May Withdraw His Proposal for a Period of Sixty (60) Days After Date Set for Openingof Bids. All Proposals Must Be Enclosed in an Envelope, Sealed and Addressed to the "clerk Ofsanitary and Improvement District 629" and Shall Be Marked "proposal for Stormsewer - Section Iii" With the Bidder's Name and Address on Said Envelope.the Bid Security Shall Be in a Separate Sealed Envelope Attached to the Proposal Envelope Andshall Be Marked "bid Security" With the Project Identified Thereon. Proposals Received After Theabove Time Shall Be Returned Unopened to the Bidder Submitting the Proposal sanitary and Improvement District 629 of Douglas County, Nebraska, Reserves the Right to Rejectany or All Bids Received and to Waive Informalities and Irregularities.

Award

Water / Sewer

$135,623.00

Public - County

Site Work

7

8

2

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
69
Bidding Soon
848
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

September 18, 2025

Project location map

Multiple Locations, Omaha, NE


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.