BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2025 at 8:00 PM

Updated September 13, 2025

Renovation of a playground / park / athletic field in Mount Vernon, Washington. Completed plans call for the renovation of a playground / park / athletic field.

The City of Mount Vernon is accepting bid proposals for the Bakerview Park Restroom Renovation project. Engineer's Esti-mate: $80,000 - $95,000 Question Submission Deadline: 08/14/2025 at 12:00 PM PT Questions submitted via Q&A through the Citys e-Procurement Portal. Contact Information Jennifer Berner Director Parks & Enrichment Services 1717 S. 13th Street Mount Vernon, WA 98273 Email: jenniferb@mountvernonwa.gov Phone: (360) 336-6245 Work is anticipated to be completed within a dura-tion of 30 working days. rein-The restoration work in-cludes replacing, forcing and/or refinishing structural walls, sheathing and roof framing mem-bers, doors, light fixtures and exterior & interior fin-ishes such as metal roof-ing, lap siding, plywood and gypsum sheathing. New and repaired finishes will be painted to match the existing construction where applicable. The City of Mount Vernon reserves the right to reject any or all bid proposals, revise or cancel the work, complete the work by oth-er means, or to postpone the bid award by up to thirty (30) days after bid opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Site Walk (Non-Mandatory): A second Site Walk has been added and will be held on August 11, 2025, at 10:00 am at Bakerview Park, 3101 E Fir Street, Mount Vernon, WA 98273. Question Submission Deadline: The question submission deadline has been extended to August 14, 2025, at 12:00 pm. The proposed project is for the restoration of the northeast portion of the existing Bakerview Park concessions / restroom building that was damaged by a fire in 2024. The restoration entails replacing, reinforcing and/or refinishing structural walls, sheathing and roof framing members, doors, light fixtures and exterior & interior finishes such as metal roofing, lap siding, plywood and gypsum sheathing. New and repaired finishes will be painted to match the existing construction where applicable.

Award

Playgrounds / Parks / Athletic Fields

$74,234.00

Public - City

Renovation

15

22

13

7

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
134
Bidding Soon
3,194
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2025

September 22, 2025

Project location map

3101 E Fir St, Mount Vernon, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.