BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated September 4, 2025

Renovation of a power facility in Fort Nelson, British Columbia. Completed plans call for the renovation of a power facility.

This RFP is for a contract that generally includes installation of the Air Cooled Condenser Dephlegmator Section, removal of the existing old equipment and commissioning at BC Hydro Nelson Generating Station (FNG) that is located at mile 284.5 (457.84 km) along the Alaska Highway (97) and approximately 22 km south of Fort Nelson town.

Post-Bid

Power Plant

$500,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2025

November 1, 2025

Project location map

BC-97, Fort Nelson, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.