BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2025 at 8:00 PM

Updated September 4, 2025

Site work and paving for a civil project in Miami, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Scope of Work. Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the Work in accordance with the Contract Documents. Work includes but is not limited to the following: Rehabilitation work at SW 57 Avenue over Snapper Creek Canal Bridge (874251) is to include joint replacement, superstructure repairs, milling and resurfacing, signing, and pavement markings as shown in the Plans, and cleaning of the existing bridge deck drains All RFI requests should be e-mailed to reyesel@miamidade.gov while copying the Clerk of the Board (clerkbcc@miamidade.gov).

Post-Bid

Bridges / Tunnels

$254,875.00

Public - County

Paving, Site Work

26

17

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
133
Bidding Soon
1,761
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2025

December 1, 2025

Project location map

SW 57th Ave, Miami, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.