BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2025 at 8:00 PM

Updated September 27, 2025

Demolition, site work, renovation and addition to an educational facility in Diana, Texas. Completed plans call for the addition of a 29,776-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

As of September 26, 2025, an awarded general contractor has been identified. All trades have been awarded Construction is expected to start November 2025. The previous solicitation is for reference purposes only. A. The work covered by this section of the specifications consists of furnishing all labor, material, and equipment necessary to perform all operations in connection with the removal of various existing materials, finishes, etc. to permit the installation of all new work in strict accordance with these specifications and the applicable drawings. B. Prior to any demolition or renovation on any school district property the Contractor / Construction Manager shall verify that the Owner has provided written notification to the Texas Department of Health, Toxic Substances Control Division, Asbestos Programs Branch as follows C. "The Texas Department of Health (department) shall be notified on a form specified by the department of any asbestos abatement activity, renovation or operations and maintenance (O&M) activity affecting asbestos-containing material (ACM), or any demolition in facilities or public buildings. Notification shall be made to the department no less than 10 working days (not calendar days) prior to commencement of the activity and shall be submitted on the form specified by the department. It is a requirement that the department notification form be filled out completely and properly ... National Emission Standards for Hazardous Air Pollutants (NESHAP) requirements apply equally to both the NESHAP and Texas Asbestos Health Protection Act (TAHPA) notification requirements. The Project sites are generally described as a) Robert F. Hunt Elementary School: 11150 State Hwy 154 East, Diana TX 75640. b) New Diana Middle School: 11854 State Hwy 154 East, Diana TX 75640. c) New Diana High School: 11826 State Hwy 154 East, Diana TX 75640. d) Gym: 1373 US Hwy 259 South, Diana TX 75640. New Diana Independent School District 2024 Bond New Multipurpose Gym. Additions and Renovation to Existing Band Hall New Secured Vestibules at the High School and Middle School.

Award

Educational

$18,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

247

28

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
73
Bidding Soon
545
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2025

November 17, 2025

Project location map

Multiple Locations, Diana, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.