Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 24, 2026 at 8:00 PM

Updated August 29, 2026

Site work and new construction of a mixed-use development in San Bernardino, California. Working plans call for site work for a municipal facility; for the construction of a pre-engineered storage facility; and pre-engineered storage facility.

Project Description San Bernardino County is advancing the development of the Probation Field Operations Building, a modern and strategically designed facility that will serve as a critical hub for the County's adult probation field operations. This new 78,904-square-foot, multi-story building is intended to be located at the southeast corner of the County's government campus, near W. 3rd Avenue and N. Sierra Way. The objective of the Project is to leverage excellence in design and planning to maximize operational efficiency, enhance security, optimize building systems performance and energy efficiency, and create a healthy workplace environment to support current needs and future growth while maintaining the highest standards of quality in alignment with County requirements. The Project will include administrative offices, specialized probation units, training spaces, and secure staff areas, along with a public-facing lobby and client intake rooms. The site will feature secured and unsecured parking, secure perimeter controls, and infrastructure upgrades to support safe and efficient operations. As of August 24, 2026, the design/builder is currently finalizing schematic designs, environmental permitting, and a Guaranteed Maximum Price (GMP). A start date for construction has not been announced. Attempts to obtain more information is underway. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Pre-Construction/Negotiated

Warehouse / Distribution - Pre-Engineered Storage Building

$72,000,000.00

Public - County

New Construction, Site Work

3

12

7

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
630
Active Projects
291
Bidding Soon
4,262
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2025

March 1, 2027

Project location map

W 3rd St & N Sierra Way, San Bernardino, CA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed