BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 15, 2025

Site work for a water / sewer project in Caryville, Tennessee. Completed plans call for site work for a water / sewer project.

Bid Security in the amount of five (5%) percent of the Bid must accompany each Bid. No bid may be withdrawn within sixty (60) days after the scheduled closing time for receipt of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities in the Bids, and to accept the bid that is in the best interest of the Owner. Questions concerning the CONTRACT DOCUMENTS will be directed to the ENGINEER, Steve Bostic, P.E., sbostic@ldainc.com. All questions will be answered by issue of an addendum. The cutoff time for all questions is 4:00 PM, EST, August 7, 2025. Bidder's name, address, license number, expiration date and that part of classification which applies to the Project(s) and the name, address and licensing information for Masonry, Plumbing, HVAC and Electrical Contractors must be on the sealed envelope containing the executed Bid Form. All required items must be listed, with any item(s) that are not applicable to the Project in accordance with the Regulations to be marked "not applicable to this project". In compliance with the act, sealed envelopes will not be opened unless all required information is properly displayed. Contractor must comply with all "Drug Free Requirements" and the requirements of the American Rescue Plan Act (ARPA). The work of each Contract in general consists of construction of the following water main improvements: Phase 1: A. Approximately 8700 linear feet of 12" PVC water main. B. Approximately 15 service connections. C. Approximately 500 linear feet of 3/4 " service pipe. D. Tee and valve assemblies. E. Connections to existing mains. F. Other appurtenances required for a complete, functional system. G. The allotted time for construction is 180 days. Phase 2: A. Approximately 3700 linear feet of 12" PVC water main. B. Approximately 15 service connections. C. Approximately 500 linear feet of 3/4 " service line. D. Connection to existing mains. E. Other appurtenances required for a complete, functional system. F. The allotted time for construction is 150 days. If both Phases are awarded to a single Bidder, the Contract time shall be 300 days.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
112
Bidding Soon
703
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

September 11, 2025

Project location map

Multiple Locations, Caryville, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.