Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 30, 2025 at 8:00 PM
Updated October 1, 2025
Site work for a water / sewer project in Macon, Georgia. Completed plans call for site work for a water / sewer project.
Replacement of 12-in Valves Vineville Ave-Vista Cir Q/A :- All bid questions must be submitted to the Owner by 10:00 A.M. on September 2, 2025. The Bidder should attend the pre-bid meeting in its entirety A street address must be provided to ensure prompt delivery. No partial sets of bidding documents shall be issued. Bidders must purchase the Contract Documents in order to be eligible to submit a bid. Bid documents on the MWA website are for informational purposes only. Each Bid must be accompanied by a Bid Bond in the amount of 10% of the Bid, prepared on the form of Bid Bond that is part of the Contract Documents, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570. Bidders must comply with the Disadvantaged Business Enterprise Participation Requirements specified in the Instructions to Bidders. The Bidder shall affix to the outside of its Bid envelope the Bidder's Georgia Utility Contractor License Number. A license number of a Utility Manager or a subcontractor is insufficient, and any Bid that fails to affix to the outside of its Bid envelope the Bidder's Georgia Utility Contractor License Number may be rejected.The successful Bidder for this Project shall be required to furnish a Performance Bond and Payment Bond, satisfactory to the Owner, each in the amount of 100 % of the Contract Price. Employment of Local Businesses and Contractors: It is the desire of the Owner that local businesses--including disadvantaged, minority, and women enterprise subcontractors-- be given the opportunity to participate on the various parts of the Work. The Owner's encouragement of participation of disadvantaged, minority, and women enterprises and of locally owned businesses and contractors is not intended to restrict or limit competitive bidding or to increase the cost of the Work. The Owner supports a healthy, free market system that seeks to include responsible local businesses and provide ample opportunities for local business growth and development. In an effort to assist minority-owned businesses, Georgia law permits an income tax adjustment on the state tax return of any company that subcontracts with a certified minority-owned firm to furnish goods, property or services to the State of Georgia pursuant to O.C.G.A. 48-7-38. Suppliers should consult with their tax advisors to find out how to take advantage of these tax credits. The Owner reserves the right to reject any or all Bids. The Owner reserves the right to waive informalities and technicalities. The Project consists of replacing (2) Existing 12" Gate Valves and Install (1) New 12" Gate Valve on the 12" Cast Iron Public Water Mains at the intersection of Vineville Ave and Vista Circle. Work includes Mill and Pave Asphalt in work area and 50 L.F. past in both directions, traffic control, after hours work, and Thermoplastic Striping Replacement. This project is within State Route 19 therefore all work must follow GDOT Standards and Specifications. All work must be conducted between 10:00 PM and 5:00 AM for night work (or between 9:00 AM and 4:00 PM for day work, if necessary). MWA will provide the 12" gate valves, coordinate and execute the water main shut downs, and secure the GDOT Utilities permit in coordination with the contractor. Please note: it is MWA's understanding that there are old railroad tracks buried under the pavement of Vineville Ave in the vicinity of this project. Any effects of the buried railroad tracks on this project are unknown. The Project will be awarded in one Contract. Fifty-one percent (51%) of the Work under the Contract Documents must be self-performed by the General Contractor. The Project will be awarded by base bid [or "by base bid plus selected alternates"] on a lump sum basis for the performance and completion of all Work required by the Contract Documents. The Contract Documents include, but may not be limited to, the Instructions to Bidders, the Contract Agreement, the General Conditions, the Drawings, the Specifications (Divisions 01 through 46, inclusive, where applicable), and the forms of Bid Bond, Performance Bond, and Payment Bond.
Award
Water / Sewer
$126,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 23, 2025
October 23, 2025
Multiple Locations, Macon, GA
Related To This Project
Macon, GA
Bid Date: May 28 2020
Macon, GA
--
Macon, GA
--
Macon, GA
--
Macon, GA
--
Macon, GA
--
Macon, GA
--
Macon, GA
Bid Date: Aug 21 2025
Macon, GA
Bid Date: Aug 28 2025
Macon, GA
Bid Date: Aug 20 2025
Macon, GA
Bid Date: Aug 22 2025
Macon, GA
Bid Date: Aug 28 2025
Macon, GA
Bid Date: Aug 14 2025
Macon, GA
Bid Date: Aug 21 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
