BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 19, 2026

Site work for a power facility in Edmonton, Alberta. Conceptual plans call for site work for a power facility.

To provide renewable energy to the next stages of Blatchford development, Energy Center #2 (EC2) will be another sustainable energy source in addition to the existing Energy Center #1 (EC1) which relies on the existing geo-exchange field. The key objective of EC2 is to supply renewable thermal energy utilizing a new geoexchange borefield along with peak loads being serviced by boilers and cooling towers. Delivery method is Project Develop Delivery Model (PDDM). TIMELINE: Preliminary design work has been completed. An Integrated Project Delivery (IPD) will be utilized; Request for Proposals for IPD services has been issued by the owner. Design and construction will proceed in a staged approach to meet interim energy requirements until the SHX and EC2 facilities are fully commissioned and in-service (2029/2030).

Conceptual

Power Plant

$75,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
56
Bidding Soon
589
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2028

Project location map

Yellowhead Trail & 121 St NW, Edmonton, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.