Published October 16, 2025 at 8:00 PM
Updated October 17, 2025
Site work for a road / highway in Plant City, Florida. Completed plans call for site work for a road / highway.
This is a readvertisement of the Traffic Signal Cabinet Upgrade Installation project. The scope of work will include but not limited to the installation of (17) seventeen TS2 Type 6 cabinets with piggy back UPS. Contractor will be responsible removal of the existing NITS cabinet, installation of the new TS2 cabinet, transferring of existing equipment such as Controller, MMU, TS2 Power Supply, EVP (if applicable), ITS switch w/power supply, Fiber Patch Panel, Batteries for piggy back UPS, camera power supply (if applicable). Contractor will be responsible for all rearranging field wiring to neatly coil in new cabinet along with new field wire connections. Contractor will be responsible for off duty officer for traffic control of dark state signal. Question Submission Deadline:August 28, 2025, 2:00pm Scope of work will include but not limited to the installation of (17) seventeen TS2 Type 6 cabinets with piggy back UPS. The City of Plant City will complete the testing, burn-in and configuration of the cabinet at the traffic facility. Contractor will take possession of the cabinet from the City of Plant City Traffic Operations facility and proceed directly to site, storage of cabinets at a secondary location is not permitted. Once the contractor has taken possession of the cabinet they will be responsible removal of the existing NITS cabinet, installation of the new TS2 cabinet, transferring of existing equipment such as Controller, MMU, TS2 Power Supply, EVP (if applicable), ITS switch w/power supply, Fiber Patch Panel, Batteries for piggy back UPS, camera power supply (if applicable). The City will be responsible for remounting of the EVP antennas. Contractor will be responsible for all rearranging field wiring to neatly coil in new cabinet along with new field wire connections. Contractor will be responsible for off duty officer for traffic control of dark state signal. Cabinets will require silicone around the bottom of the base, new nuts and washers. Below is a list of the intersection scope for cabinet replacements. All cabinets removed shall be returned to the City of Plant City Traffic Facility at 1302 W Spencer St. 2.2. List of Intersections 1. Reynolds St at Wheeler St 2. Reynolds St at Evers St 3. Reynolds St at Collins St 4. Reynolds St at Palmer St 5. Baker St at Collins St 6. Baker St at Wheeler St 7. Baker St at Franklin St 8. Knights Griffin Rd at Alexander St 9. Sam Allen Rd at Alexander St 10. Sam Allen Rd at Paul Buchman Hwy 11. Wheeler St at Frontage Rd 12. Maryland Ave at Baker St 13. Alexander St at Donna Dr 14. Alexander St at Timberlane Dr 15. Alexander St at Thonotosassa Rd 16. Alexander St at Baker St 17. Alexander St at Reynolds St
Award
Roads / Highways
$102,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
October 6, 2025
Multiple Locations, Plant City, FL
Related To This Project
Plant City, FL
Bid Date: Nov 13 2025
Plant City, FL
Bid Date: Nov 13 2025
Plant City, FL
Bid Date: Nov 03 2025
Plant City, FL
Bid Date: Nov 07 2025
Plant City, FL
Bid Date: Dec 18 2025
Plant City, FL
Bid Date: Dec 16 2025
Plant City, FL
--
Plant City, FL
Bid Date: Jul 14 2025
Plant City, FL
--
Plant City, FL
Bid Date: Jun 05 2025
Plant City, FL
Bid Date: Jun 11 2025
Plant City, FL
Bid Date: May 08 2025
Plant City, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.