BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work for a water / sewer project in Township Of Perth East, Ontario. Completed plans call for site work for a water / sewer project.

The work to be done under this contract consists of supplying all labour, equipment and materials to construct the drainage work as outlined in the Scope of Work, Drawings, General Conditions and other Specifications. Question Deadline: Tue Aug 19, 2025 12:00:00 PM (EDT) Documents can be obtained from Bids and Tenders - https://pertheast.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/2e1b929e-9061-408c-b71e-f579657bc16a# Bid results are as follows: TAS Excavating and Rentals Ltd Main Drain (open): $40,431.40 Main Drain (Enclosure): $174,873.93 Backfilling existing ditch (Sta. 0+527 to Sta. 1+352): $26,837.50 Provisional Item: $5,020.00 Branch A: $16,668.50 Work to be done on the Ministry of Transportation Road Allowance, Line 34, (Highway 8) (Sta. 0+000 to Sta. 0+030) : $46,664.13 Provisional Item 2: $2,200.00 Branch B: $27,623.25 Provisional Item 3: $2,200.00 A.G. HAYTER CONTRACTING LTD. Main Drain (open): $31,907.00 Main Drain (Enclosure): $115,632.00 Backfilling existing ditch (Sta. 0+527 to Sta. 1+352): $18,675.00 Provisional Item: $10,260.00 Branch A: $15,400.00 Work to be done on the Ministry of Transportation Road Allowance, Line 34, (Highway 8) (Sta. 0+000 to Sta. 0+030) : $42,505.00 Provisional Item 2: $4,000.00 Branch B: $25,285.00 Provisional Item 3: $4,000.00 Robinson Farm Drainage Main Drain (open): $59,150.00 Main Drain (Enclosure): $119,138.00 Backfilling existing ditch (Sta. 0+527 to Sta. 1+352): $35,025.00 Provisional Item: $5,900.00 Branch A: $18,436.00 Work to be done on the Ministry of Transportation Road Allowance, Line 34, (Highway 8) (Sta. 0+000 to Sta. 0+030) : $38,500.00 Provisional Item 2: $2,300.00 Branch B: $27,046.00 Provisional Item 3: $2,300.00 Hanna & Hamilton Construction Main Drain (open): $30,165.00 Main Drain (Enclosure): $143,191.25 Backfilling existing ditch (Sta. 0+527 to Sta. 1+352): $16,525.00 Provisional Item: $1,200.00 Branch A: $19,316.50 Work to be done on the Ministry of Transportation Road Allowance, Line 34, (Highway 8) (Sta. 0+000 to Sta. 0+030) : $46,000.00 Provisional Item 2: $2,000.00 Branch B: $30,913.50 Provisional Item 3: $2,000.00

Bid Results

Water / Sewer

$250,000.00

Public - County

Site Work

7

13

2

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
383
Active Projects
218
Bidding Soon
2,732
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2025

July 15, 2026

Project location map

Multiple Locations, Township Of Perth East, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.