Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work for a water / sewer project in Township Of Perth East, Ontario. Completed plans call for site work for a water / sewer project.

The work to be done under this contract consists of supplying all labour, equipment and materials to construct the drainage work as outlined in the Scope of Work, Drawings, General Conditions and other Specifications. Question Deadline: Tue Aug 19, 2025 12:00:00 PM (EDT) Documents can be obtained from Bids and Tenders - https://pertheast.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/2e1b929e-9061-408c-b71e-f579657bc16a# Bid results are as follows: TAS Excavating and Rentals Ltd Main Drain (open): $40,431.40 Main Drain (Enclosure): $174,873.93 Backfilling existing ditch (Sta. 0+527 to Sta. 1+352): $26,837.50 Provisional Item: $5,020.00 Branch A: $16,668.50 Work to be done on the Ministry of Transportation Road Allowance, Line 34, (Highway 8) (Sta. 0+000 to Sta. 0+030) : $46,664.13 Provisional Item 2: $2,200.00 Branch B: $27,623.25 Provisional Item 3: $2,200.00 A.G. HAYTER CONTRACTING LTD. Main Drain (open): $31,907.00 Main Drain (Enclosure): $115,632.00 Backfilling existing ditch (Sta. 0+527 to Sta. 1+352): $18,675.00 Provisional Item: $10,260.00 Branch A: $15,400.00 Work to be done on the Ministry of Transportation Road Allowance, Line 34, (Highway 8) (Sta. 0+000 to Sta. 0+030) : $42,505.00 Provisional Item 2: $4,000.00 Branch B: $25,285.00 Provisional Item 3: $4,000.00 Robinson Farm Drainage Main Drain (open): $59,150.00 Main Drain (Enclosure): $119,138.00 Backfilling existing ditch (Sta. 0+527 to Sta. 1+352): $35,025.00 Provisional Item: $5,900.00 Branch A: $18,436.00 Work to be done on the Ministry of Transportation Road Allowance, Line 34, (Highway 8) (Sta. 0+000 to Sta. 0+030) : $38,500.00 Provisional Item 2: $2,300.00 Branch B: $27,046.00 Provisional Item 3: $2,300.00 Hanna & Hamilton Construction Main Drain (open): $30,165.00 Main Drain (Enclosure): $143,191.25 Backfilling existing ditch (Sta. 0+527 to Sta. 1+352): $16,525.00 Provisional Item: $1,200.00 Branch A: $19,316.50 Work to be done on the Ministry of Transportation Road Allowance, Line 34, (Highway 8) (Sta. 0+000 to Sta. 0+030) : $46,000.00 Provisional Item 2: $2,000.00 Branch B: $30,913.50 Provisional Item 3: $2,000.00

Bid Results

Water / Sewer

$250,000.00

Public - County

Site Work

7

13

2

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
149
Bidding Soon
2,414
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2025

July 15, 2026

Project location map

Multiple Locations, Township Of Perth East, ON

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed