Site work and new construction of an elderly care / assisted living facility in Choctaw, Mississippi. Completed plans call for the construction of a elderly care / assisted living facility; and for site work for a elderly care / assisted living facility.
MBCI Early Childhood Development Facility Mississippi Band of Choctaw Indians (Choctaw, Mississippi) Questions regarding website registration, online orders, and electronic bidding please contact Plan House Printing at (662) 407-0193. Proposals shall be submitted with Proposal Security in the form of Certified Check or acceptable Bid Bond in an amount equal to at least five percent (5%) of the base bid; such security is to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal. The Bid Bond, if used, shall be payable to the Owner. Bonds on the project must be received on or before the period scheduled for the project and no bid may be withdrawn after the scheduled closing time for the project. Bids must be firm for a period of forty-five (45) days after the scheduled time of opening. A 100% Performance-Payment Bond issued by a surety company authorized to do business in the State of Mississippi will be required within ten (10) days after the successful bidder has been notified of the award of the contract to him. When bids are submitted electronically, the requirement for including a certificate of responsibility, or a statement that the bid enclosed does not exceed Fifty Thousand Dollars ($50,000.00), on the exterior of the bid envelope shall be deemed in compliance by including the same information as an attachment with the electronic bid submittal. The Owner reserves the right to reject any or all bids and to waive irregularities. A. The following Supplemental Conditions modify the iGeneral Conditions of the Contract for Construction,i AIA Document A201-2017 Edition. Where a portion of the General Conditions is modified or deleted by the Supplemental Conditions, the unaltered portions of the General Conditions shall remain in effect. In the event of a conflict between the General Conditions of the Contract for Construction and Section 00 73 00, Section 00 73 00 shall control even if the conflicting provisions in the General Conditions of the Contract for Construction is not expressly revised or deleted by reference in Section 00 73 00. B. The General Conditions may also be supplemental or amplified elsewhere in the Contract Documents by provisions located in, but not necessarily limited to, Division 1 of the Specifications. Related work specified elsewhere: 1. Section 04 22 00 n Concrete Masonry Units 2. Section 05 50 00 n Metal Fabrications 3. Section 09 91 00 n Paint 4. Division 26 n Electrical Design, engineer, and construct formwork, shoring, and bracing to meet design and code requirements so that resultant concrete conforms to required shapes, lines, and dimensions. A. Furnish all labor, materials and services necessary for the procurement and installation of the equipment included in Food Service sections B. Supervise and provide required instructions for work to be performed by other contractors associated with the requirements for all equipment related to this section. C. Work is to be accomplished as called for in specifications and shown in drawings, so that all items of equipment are completely functional for the purpose for which they were designed. When / if there is a discrepancy between drawings, specifications or field conditions, bidders should seek clarification from the consultant prior to bidding. D. If the drawings disagree with the specifications or the specifications with the drawings, the better quality or the greater quantity of the work or materials should be used to ensure no additional cost to the owner. E. Secure and procure permits and licenses as required by all authorities having jurisdiction. Comply with all laws, ordinances, rules, regulations and contract requirements in connection with the work. A. The work to be performed under these Specifications shall include all labor, materials, equipment, transportation, construction, facilities, and incidentals necessary for the proper execution, installation, testing, adjustments, and completion of all Work shown and indicated in the Contract Documents. The intent is that the installation shall be 'complete' in every respect, pleasant in appearance, and ready for use. B. The work under these specifications shall in general include, but is not limited to, furnishing and installing the following: 1. Water-based fire suppression system 2. Payment of all fees and permits required for the work of this section, including utility service taps 3. Location and sizes of furring, chases and access panels required for installation of water-based fire suppression system systems A. The work to be performed under these Specifications shall include all labor, materials, equipment, transportation, construction, facilities, and incidentals necessary for the proper execution, installation, testing, adjustments, and completion of all Mechanical Work shown and indicated in the Contract Documents. The intent is that the installation shall be 'complete' in every respect, pleasant in appearance, and ready for use. B. The work under these specifications shall in general include, but is not limited to, furnishing and installing the following: 1. Heating, ventilating, and air conditioning system 2. Natural gas distribution system 3. Control wiring 4. Payment of all fees and permits required for the work of this section, including utility service taps 5. Location and sizes of furring, chases and access panels required for installation of mechanical systems 6. Ductwork, accessories and fans for exhaust
Bid Results
Elderly Care / Assisted Living
$5,235,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2025
September 29, 2025
101 Industrial Rd, Choctaw, MS
Related To This Project
Choctaw, MS
Bid Date: Oct 17 2025
Choctaw, MS
Bid Date: Nov 14 2025
Choctaw, MS
Bid Date: Nov 18 2025
Choctaw, MS
Bid Date: Oct 09 2025
Choctaw, MS
Bid Date: May 29 2025
Choctaw, MS
Bid Date: Apr 01 2025
Choctaw, MS
Bid Date: Jan 22 2025
Choctaw, MS
Bid Date: Jan 29 2025
Choctaw, MS
Bid Date: Dec 20 2024
Choctaw, MS
Bid Date: Oct 30 2024
Choctaw, MS
Bid Date: Sep 25 2024
Choctaw, MS
Bid Date: Aug 14 2024
Choctaw, MS
Bid Date: Aug 07 2024
Choctaw, MS
Bid Date: Jun 21 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.