BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2025 at 8:00 PM

Updated August 5, 2025

This is a service / maintenance or supply contract in Effingham, Illinois. Contact the soliciting agency for additional information.

This project requires 27% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on November 12, 2025, at 9:00 AM at the Region Four/District Seven Office in Effingham. Phase III engineering services are required to provide assistance in construction inspection services for construction projects throughout District Seven. The Consultant will be required to furnish one (1) to three (3) qualified staff as approved by the District to assist District Resident Engineers/Technicians in performing the required construction inspection, field materials testing & inspection (all field material testing will be done with District equipment), survey/layout, prepare records, maintain documenentation, provide general assistance as a member of a field crew and other duties to allow the timely completion of projects in accordance with IDOT specifications. Projects requiring staffing may include, but are not limited to, District wide patching and resurfacing contracts or specific bridge projects or urban rehabilitation projects Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the Special Services (Surveying) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 44 - RFQ - Various Phase III Projects, Various Routes, Various Counties, Region Four/District Seven

Conceptual

Roads / Highways

$1,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
50
Bidding Soon
793
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2026

Project location map

Multiple Locations, Effingham, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.