BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2025 at 7:00 PM

Updated December 23, 2025

Renovation of a municipal facility in Phoenix, New York. Completed plans call for the renovation of a municipal facility.

The Town of Schroeppel is soliciting proposals from qualified contractors for the supply and installation of a new standby DIESAL generator system. This project includes retiring the existing generator in place, replacing the existing automatic transfer switch, and installing a new generator on a poured concrete pad located in the designated alcove near the radio tower. Contract Term: 6 months Location: 69 County Route 57A, Phoenix, NY 13135 - Oswego Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 0.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 0.00% WBE Goal: 0.00% CR#: 2129707 Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 0.00% 1. Supply and Delivery of a new commercial-grade standby generator sized appropriately for the facility's (Town Hall and Town Highway Garage) electrical needs. The generator must meet all applicable codes and standards. 2. Retirement of Existing Generator - The current generator will be retired in place. Removal is not required/Disconnection required 3. Removal of Existing Transfer Switch - The existing automatic transfer switch (ATS) shall be disconnected and removed safely and in accordance with all applicable codes. 4. Installation of New Automatic Transfer Switch - A new ATS shall be installed and integrated with the new generator system. The ATS must support seamless operation and transfer of power. 5. Concrete Pad Construction - The generator will be installed on an OEM required poured concrete pad. The contractor is responsible for the construction of the pad, including all excavation, forming, reinforcing, pouring, and finishing. 6. Installation of New Generator - Installation of the generator in the alcove near the radio tower, including all electrical, fuel, and grounding connections. 7. Testing and Commissioning - After installation, the generator must be fully tested and commissioned to ensure reliable operation. 8. Training and Documentation - Provide user manuals, maintenance instructions, and onsite training for designated town staff. 9. Permitting and Inspections - obtain all necessary permits and complete all necessary third-party inspections.

Sub-Bidding

Municipal

$130,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
125
Bidding Soon
1,494
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2026

February 23, 2026

Project location map

69 County Rte 57A, Phoenix, NY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.