Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 24, 2025 at 8:00 PM
Updated September 25, 2025
Site work for a water / sewer project in Davenport, Iowa. Completed plans call for site work for a water / sewer project.
**As of September 24, 2025, the project was awarded to to the following companies: Hagerty Earthworks LLC with an awarded amount of $780,756.00 Hometown Mechanical with an awarded amount of $766,143.00 JC Dillon Inc with an awarded amount of $928,905.00 Petersen Plumbing with an awarded amount of $784,858.00 River Bend Plumbing with an awarded amount of $399,060.00 Tappendorf Plumbing with an awarded amount of $826,082.00 ,with an awarded amount of $4,485,804.00** For all bids over $100,000, the City of Davenport requires a Bid Bond of 5% of the bid amount. A copy of the front page of the bid bond must be attached in the "Response Attachments" tab of the bid package. Bids over $100,000, submitted without a bid bond will not be considered. For awarded bids over $100,000, the awarded contractor will be required to furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract amount, and said bond to be issued by a responsible surety approved by the City and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained. Working Days - The contractor shall begin repair work promptly after it has been assigned to them by the City of Davenport. All work to the assigned job shall be completed within ten (10) working days following the date of contractor notification. Liquidated Damages - No excavation in a street, sidewalk, or driveway shall be left open for more than five (5) working days after the sewer or water services and fixtures have been repaired with liquidated damages of $1,000/day levied for failure to comply The City reserves the right to reject any or all bids and to waive technicalities and irregularities, if it is deemed in the public interest to do so. Questions Due 8/12/2025 10:00:00 AM (CT) The construction season is fast approaching.", "Here's what you need to know as we head into the 2025 construction season
Award
Water / Sewer
$4,485,804.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2025
September 19, 2025
1200 E 46th St, Davenport, IA
Related To This Project
Davenport, IA
--
Davenport, IA
--
Davenport, IA
Bid Date: Aug 25 2025
Davenport, IA
Bid Date: Sep 12 2025
Davenport, IA
Bid Date: Sep 12 2025
Davenport, IA
Bid Date: Sep 16 2025
Davenport, IA
--
Davenport, IA
Bid Date: Aug 04 2025
Davenport, IA
Bid Date: Jul 23 2025
Davenport, IA
Bid Date: Jul 31 2025
Davenport, IA
--
Davenport, IA
Bid Date: Aug 19 2025
Davenport, IA
Bid Date: Jul 24 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
