BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 25, 2025 at 8:00 PM

Updated August 27, 2025

Renovation of a fire / police facility in Golden Meadow, Louisiana. Completed plans call for the renovation of a 3,600-square-foot fire / police facility.

A. General: The Work of this Project consists of all work identified and otherwise required by the Contract Drawings, including Architectural, Mechanical, Plumbing, Electrical, and by the remainder of this Project Manual, including all Divisions and Sections. All Work indicated on the Documents is included in the Scope of this Work unless specifically indicated to be Not in Contract (N.I.C.). B. Scope of Work: This project consists of the construction of a new 3,600+/- square foot fire station at 1003 S. Bayou Drive, Golden Meadow, Louisiana 70357. 1. Perform all site demolition work indicated on the Drawings or as otherwise required to accomplish the finished results indicated. The Contractor shall make all required tie-ins to the Owner's existing utilities and shall perform all necessary shut downs, testing, verifications and certifications. All work of this nature shall be fully coordinated with the Owner. 2. Execute all construction work indicated and otherwise required to achieve the results indicated. The Work is a complete package of work from site demolition to final finishing. New construction shall be complete and finished, ready for the Owner's use. Upon Project completion all areas of construction shall be complete and ready for occupancy by designated users with no additional work by the Owner except for items of work specifically identified as being executed by the Owner or his agent. The Contractor shall do this work without unduly disturbing ongoing functions of the neighboring properties and shall protect all areas of the site not included in the Work but in proximity of Work during the execution of this Contract. DI NUMBER: 1209209 Question Deadline 08/19/2025 Bidders requiring clarification or interpretation of Bid Documents shall make a written request to the Architect to reach him at least seven (7) days prior to the date and time of receipt of bids. No Bid shall be considered or accepted unless the bid is accompanied by bid security in an amount not less than five percent (5%) of the Base Bid and all Additive Alternates. The bid security shall be in the form of certified check or cashier's check drawn on a bank insured by the FDIC, or on the Bid Bond Form contained in the Front End Documents written by a surety company licensed to do business in Louisiana with a A.M. Best rating of "A" or better, countersigned by a person who is under contract with the surety company or bond insurer as a licensed agent in this state and who is residing in this state. The Owner reserves the right to reject any and all bids

Post-Bid

Fire / Police

$1,800,000.00

Public - County

Renovation

107

48

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
0
Bidding Soon
303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

October 27, 2025

Project location map

1003 S Bayou Dr, Golden Meadow, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.