Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 31, 2025 at 7:00 PM
Updated January 7, 2026
Renovation of a mixed-use development in Worcester, Massachusetts. Completed plans call for the renovation of a educational facility.
Abby Kelley Foster Charter Public School Renovation & Campus Improvements Interested Firms Must Be Certified by the Division of Capital Asset Management (Dcamm) in the Following Categories of Work: Prime Contracting. The Rfq Will Be Available on Wednesday, December 10, 2025. Question Deadline 12/31/2025 at 4:00 PM ET Estimated Construction Start: Summer 2026 Estimated Building Construction Completion: High School in July 2027, remainder in Fall 2027 Estimated Project Completion (including demo/site): High School in July 2027, remainder in Fall 2027 Abby Kelley Foster Charter Public School currently occupies a three (3) building campus at 2, 6 and 10 New Bond Street in Worcester, MA. These buildings comprise their Elementary, Middle, and High Schools. The area around the campus is largely industrial. Private parcels are interspersed between those owned by AKF. WBDC is currently developing much of the surrounding area into pad-ready manufacturing parcels, which will include roadwork and convert both New Bond St and C street into public roads. The following scope is included through schematic design services. Final scope and budget to be set after Schematic Design and an initial estimate. 10 New Bond Street/High School Facility: 1. Fit out of 29,000 square feet of vacant, unfinished warehouse space to relocate 7th grade students from the Middle School into this building for a Junior/Senior high school model. To accommodate ~120 additional students, the fit-out will include 12-16 new classrooms, additional cafeteria space, a second gymnasium and additional bathrooms. The building will be occupied during construction. 2. Roof replacement. 3. Building wide security upgrades. 6 New Bond Street/Middle School Facility: 1. The renovation of the 17,500 square foot lower level, which currently consists of a cafeteria, warming kitchen, music room, as well as the attached vacant former biomedical lab space. This work will include a kitchen, most likely warming function only, enlarged cafeteria, and multipurpose space. 2. Deferred maintenance repairs to the building plumbing system. 3. Conversion of the current HVAC system to electrical air source heat pump system. 4. Building-wide bathroom upgrades. Campus-wide: 1. Turf field replacement/extension.
Post-Bid
Educational
$24,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2026
February 13, 2026
10 New Bond St, Worcester, MA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
