BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2025 at 8:00 PM

Updated September 5, 2025

Site work and paving for a mixed-use development in Marlborough, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reconstruction of Stearns Road and Peters Avenue. The work consists of furnishing all labor, equipment, and materials necessary to complete the roadway and sidewalk reconstruction of Stearns Road and Peters Avenue. Work includes full-depth roadway reclamation; removal and replacement of existing hot mix asphalt (HMA) sidewalks and berm; driveway blending; and loam and seeding of all disturbed areas. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 08/18/2025: Questions concerning the bid specifications must be submitting in writing via email to Attn: Mark Dascoli at mdascoli@marlboroughma.gov no later than 3 business days prior to the scheduled bid opening

Award

Sidewalks / Parking Lot

$1,327,821.00

Public - City

Paving, Site Work

13

9

4

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
643
Active Projects
293
Bidding Soon
4,383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2025

October 21, 2025

Project location map

Multiple Locations, Marlborough, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.