BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 27, 2025 at 7:00 PM

Updated November 28, 2025

Site work and paving for a bridge / tunnel in Mundare, Alberta. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

BF13260 Bridge Replacement Carrying HWY 626:02 Over Waskwei Creek Tributary (Construction WAC0003083). BF07183 Bridge Replacement Carrying HWY 792:06 Over Battle River (Construction WAC0003175). BF13290 Bridge Replacement Carrying HWY21:22 Over Battle River Tributary (Construction WAC0087045). BF71681 Bridge Replacement Carrying HWY14:08 Over Waskwei Creek Tributary (Construction WAC0090145). TIMELINE: Request for Proposals for engineering services has been awarded. Construction is tentatively planned for 2028 - 2031. Further update in 2026. *Budget is unreleased.

Design

Bridges / Tunnels

$12,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
9
Bidding Soon
170
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2028

Project location map

AB-626, Mundare, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.