BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2025 at 8:00 PM

Updated September 9, 2025

Renovation of a road / highway in Riverside, California. Completed plans call for the renovation of a road / highway.

The Contractor shall furnish all labor, supervision, material, parts, tools, equipment, storage, transportation, waste disposal and services necessary to perform cold planning (surface planning) consisting of approximately 338,812 square feet of existing asphalt concrete on various roads in the unincorporated area of Riverside County, in strict accordance with all of the Contract Documents. If you have any questions, please notify Monica Rossow via e-mail at mrossow@rivco.org or cell (951) 836-9699 Deadline for Submission of Questions: Date: July 28, 2025 Time: On or before 1:30 p.m. PST Email: mrossow@rivco.org (E-mail required). It is the responsibility of the bidder to confirm transmission of correspondence. The County reserves the right to reject any or all bids, to waive any discrepancy, technicality, or informalities in a bid or in the bidding process, and to make the award in any manner determined by the County to be most advantageous to the County. Liquidated Damages - It is agreed that time is of the essence for completion of this work. Therefore, the parties agree the awarded bidder (Contractor) shall pay to the County, as fixed and liquidated damages, and not as penalty, a dollar sum in the amount of $250.00 per day for each calendar day beyond the allowed time stated in the Contract Documents after which the work is completed. Liquidated damages shall be assessed after the commencement of the 5th day. Time for Completion - The work, in any area shall commence 5 business days upon notification from the County or on a date to be specified in a written order from the County. Each area shall be completed within sixty (60) days, and All work, in all areas shall be completed by June 30, 2026. Bid Guarantee The enclosed certified or cashier's check or bid bond on the provided form, made payable to the County in the amount of ten percent (10%) of the total bid, is hereby given as a guarantee that the bidder will execute and deliver the Agreement and required bonds if awarded the contract. In the event that the bidder fails or refuses to execute and deliver said documents, such check or bond is to be charged with the costs of the damages experienced by the County as a result of such failure or refusal. Mandatory Bidder Conference/Job Walk: https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_NTg5YjQ2ZGItYzAzZi00ZGU1LTg2NzEtNDE2OGQ2ZjE4Zjkz%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522d7f03410-e0a8-4159-b300-54980ef605d0%2522%252c%2522Oid%2522%253a%25227b5f757e-2bce-4f03-8f03-45d3c78bea77%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=11eae4df-a866-4078-8509-60ef7433be11&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true Meeting ID: 263 900 309 968 6 Passcode: bV9ED3wC

Bid Results

Roads / Highways

$216,840.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
672
Active Projects
279
Bidding Soon
3,242
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2025

September 10, 2025

Project location map

Multiple Locations, Riverside, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.