Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 6, 2026 at 7:00 PM
Updated March 7, 2026
Site work and paving for a mixed-use development in Manchester, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The Scope of Work consists of the removal and replacement of existing pedestrian facilities and installation of new pedestrian facilities along Manchester Road (Rte 100) from Baxter Road to Hwy 141. A new pedestrian facility will be added to the north side of Manchester Road including a prefabricated steel truss pedestrian bridge over Grand Glaize Creek. The existing pedestrian facility along the south side of Manchester Road will be reconstructed. Curb ramps and commercial entrances throughout the corridor will be replaced (as required) to bring them into ADA compliance. Pedestrian traffic signal modifications, modular block retaining walls, striping, traffic control, and other items shall be included as shown in the plans. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher. The City of Manchester hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All bidder questions must be received by 5:00 p.m. on Friday, February 13, 2026. Any questions received after this time cannot be answered. Addenda will only be sent to plan holder and plan rooms. All questions concerning the bid document preparation can be directed to the Director of Public Works Errol Tate at 636- 227-1385, ext. 154. Project specific questions can be directed to Ramin Ashrafzadeh, Horner & Shifrin, Inc. at rdashrafzadeh@hornershifrin.com or 314-335-8677. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. The City of Manchester reserves the right to reject any or all bids. No 2nd tier subcontracting will be allowed on this project. The project will be awarded to the lowest, responsive, responsible bidder.
Bid Results
Roads / Highways
$2,821,901.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
