BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Site work and paving for a mixed-use development in East Hartford, Connecticut. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Town of East Hartford is seeking qualifications and proposals from qualified engineering firms for final engineering design and utility relocation services associated with the Bissell Street Pedestrian Walkway Project and related roadway improvements. This project is located in downtown East Hartford, centered on Bissell Street--a one-way roadway that connects Main Street to a residential neighborhood to the east. The goal is to transform a portion of Bissell Street into a pedestrian-only corridor while reconfiguring nearby roadways to accommodate traffic and improve circulation. Conceptual engineering designs and roadway surveys have been completed for Phase I and II and are provided in Appendix I. The project has been broken into multiple phases for clarity: Phase I - Bissell Street Closure and Pedestrian Walkway Installation Phase I involves permanently closing Bissell Street to vehicular traffic between Main Street and Ladd Street and converting it into a pedestrian walkway. This phase emphasizes improving pedestrian connectivity between Main Street, the Town Green, and Alumni Park, and sets the foundation for broader downtown improvements. All questions and Requests for Information regarding this proposal must be submitted to Michelle Enman, Purchasing Agent, at menman@easthartfordct.gov by the end of business on Thursday, August 28, 2025. Requests for information will be answered via an addendum to the bid, to be issued by Wednesday, September 3, 2025 Phase II will address the vehicular circulation changes needed because of the Bissell Street closure. Phase II estimated budget is $2,000,000. The Town of East Hartford reserves the right to reject any or all bids or any part of all bids and to waive any informality when such action is in the best interest of the Town. The Town also reserves the right to extend by mutual consent an awarded bid when such action is in its best interest. The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

$2,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
861
Active Projects
302
Bidding Soon
7,047
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2026

Project location map

Bissell St, East Hartford, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.