Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 17, 2025 at 8:00 PM
Updated September 18, 2025
Site work for a swimming pool in Lees Summit, Missouri. Completed plans call for site work for a swimming pool.
**As of September 17th, 2025, this project has not yet been awarded. The project is expected to be awarded on October 22nd, 2025.** Activity Pool Play Structure for Summit Waves. Must include: At least two slides At least two entrance and exit points Use of existing plumbing Fit within 3,075 sq ft surface area Installed in 1 foot of water The City of Lee Summit reserves the right to amend the solicitation schedule as necessary. In the event that a Contractor cannot be selected based solely on Proposals submitted, Oral Interviews may be conducted at the City sole discretion. Bid Bond required. Final Date and Time for Inquiries : August 26, 2025 The Vendor(s) shall provide (the "Services") in accordance with the specifications, provide and install a new activity feature for Summit Waves Aquatic Center.
Post-Bid
Swimming Pools
$200,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2025
September 29, 2025
120 SW Blue Pkwy, Lees Summit, MO
Related To This Project
Lees Summit, MO
--
Lees Summit, MO
Bid Date: Sep 23 2025
Lees Summit, MO
--
Lees Summit, MO
Bid Date: Sep 03 2025
Lees Summit, MO
Bid Date: Sep 16 2025
Lees Summit, MO
Bid Date: Sep 04 2025
Lees Summit, MO
Bid Date: Sep 02 2025
Lees Summit, MO
Bid Date: Aug 21 2025
Lees Summit, MO
Bid Date: Aug 15 2025
Lees Summit, MO
--
Lees Summit, MO
Bid Date: Aug 08 2025
Lees Summit, MO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
