Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 4, 2025 at 8:00 PM
Updated September 5, 2025
Site work and paving for a mixed-use development in Fulton, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
This project consists of providingthe labor, materials, and equipmentfor improvements along NicholsStreet. Work to include the removalof existing concrete curb, sidewalks,driveways, storm box and asphaltpavements. New construction will include approximately 2,075 linear feetof curb & gutter, 1,053 square yardsof sidewalk and driveway approaches, 3,725 square yards of coldmilling, 413 tons of surface asphaltoverlay and storm sewer inlet andpipe installation. All work within public right of wayshall be, in compliance with the 2025 Missouri Standard Specifications for Highway Construction -Dated July, 2025. Each bidder must deposit with hisbid, security in the amount of (5%) ofthe bid amount, in accordance withthe Instructions for Bidders. For a contractor to be awarded thisproject the contractor must have afully responsive contractor questionnaire on file with the MissouriHighway and Transportation Commission at least 7 days prior to thebid opening date. No Second TierSubcontracting will be allowed. The wage rates applicable to thisproject have been predetermined asrequired by law and are set forth inthis specification. When Federalwage rates are applicable and included, this contract is subject tothe "Work Hours Act of 1962", (P.L.87-581: 76 Stat. 357) and implementing regulations. When state and federal wage rates are both required thehigher of the two for each job classification shall be used. Effective January 1, 2009 and pursuant to RSMo 285.530 (1), No business entity or employer shallknowingly employ, hire for employment, or continue to employ anunauthorized alien to perform workwithin the state of Missouri. Thesuccessful bidder must submit asworn affidavit and documentationaffirming the business entity's enrollment and participation in the federal work authorization program andthat all of its employees working forthe contracted services are not illegal immigrants. Upon signing the contract, the successful contractor and any subcontractor performing the work shallprovide a ten-hour OccupationalSafety and Health Administration(OSHA) construction safety programfor their on-site employees. The City of Fulton, Missouri herebynotifies all bidders that it will affirmatively ensure that in any contractor entered into pursuant to thisadvertisement, businesses ownedand controlled any socially and economically disadvantaged individualswill be afforded full opportunity tosubmit bids in response to this invitation and will not be discriminatedagainst on the grounds of race,color, religion, creed, sex, ancestry,or national origin in considerationfor an award. The DBE Contract Goal for this project is %, and DBE firms must be certified by MoDOT to attain credittowards this contract goal. There isno On the Job Trainee goal.
Bid Results
Roads / Highways
$553,017.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2025
October 2, 2025
Nichols St, Fulton, MO
Related To This Project
Fulton, MO
Bid Date: Aug 20 2025
Fulton, MO
Bid Date: Sep 19 2025
Fulton, MO
Bid Date: Sep 19 2025
Fulton, MO
--
Fulton, MO
--
Fulton, MO
--
Fulton, MO
Bid Date: Aug 20 2025
Fulton, MO
Bid Date: Aug 11 2025
Fulton, MO
Bid Date: Aug 21 2020
Fulton, MO
Bid Date: May 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
