BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work for a water / sewer project in Wheelersburg, Ohio. Completed plans call for site work for a water / sewer project.

Riverstone Subdivision Sanitary Sewer System A bid bond or certified check in the amount of ten percent (10%) of the bid price must be submitted with each proposal. The Successful bidder is required to furnish a performance bond or certified check in the amount of one hundred percent (100%) of the total bid price. The Board of County Commissioners reserves the right to reject any or all bids, to waive any informality in bids or to accept in whole or in part such bid or bids as may be deemed in the best interest of the purchaser. INSTALL NEW NPDES SANITARY SYSTEMS FOR RIVERSIDE SUBDIVISION IN HARRISON TOWNSHIP, SCIOTO COUNTY, OHIO. Question Deadline 08/21/2025 If there are any questions, please send via email at least 5 working days prior to the bid opening. Send questions to: jppickelsimer@sciotocountysanitary.us Item1: RIVERSTONE SUBDIVISION SANITARY SEWER SYSTEM Replace existing home sanitary sewer systems per the project plans for each location. This includes connection to existing home sanitary system, all electrical work necessary for new system, and demo of old sanitary sewer system. Also included is Force Main from house to new common Force Main, Installation of common Force Main, and connection to existing 48 inch storm sewer. A. Parcel 07-0123.015 130 Cynthia Ann Drive Wheelersburg, OH 45694 B. Parcel 07-123.006 445 Wheelers Mill Road Wheelersburg, OH 45694 C. Parcel 07-0123.002 475 Wheelers Mill Road Wheelersburg, OH 45694 D. Parcel 07-0123.012 583 Wheelers Mill Road Wheelersburg, OH 45694 E. Parcel 07-0123.007 633 Wheelers Mill Road Wheelersburg, OH 45694 F. Parcel 07-0123.009 635 Wheelers Mill Road Wheelersburg, OH 45694 G. Parcel 07-0123.010 685 Wheelers Mill Road Wheelersburg, OH 45694 RIVERSTONE SUBDIVISION SANITARY SEWER SYSTEM TWO YEAR SAMPLING AND SERVICE CONTRACT Contractor must provide a two year sampling and service contract. After two years all sampling and maintenance will become the responsibility of the property owner. Contractor must every 6 months: Maintaining aeration system and air diffusers Maintaining air pump Removing scum from clarifier Inspection and testing plant alarms

Award

Water / Sewer

$163,866.00

Public - County

Site Work

25

6

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
76
Bidding Soon
1,197
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

September 5, 2025

Project location map

Multiple Locations, Wheelersburg, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.