BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2025 at 8:00 PM

Updated September 26, 2025

Site work for a power facility in Pointe du Bois, Manitoba. Completed plans call for site work for a power facility.

For construction on approximately 51km of a new 115kV transmission line (PW75) from the existing Pointe du Bois Station, located at Pointe du Bois, Manitoba, to the existing Whiteshell Station. Located approximately 2km west of Seven Sisters Falls, Manitoba. The Site is located between Pointe du Bois and Seven Sisters Falls, Manitoba. The new 115kV PW75 transmission line in its entirety is approximately 51km in length, connecting Pointe du Bois Station to Whiteshell Station, via the Lee River Distribution Supply Center (DSC). This RFP constitutes the first part of Manitoba Hydro's PW75 Transmission Line work. This first part includes full construction of PW75 between Pointe du Bois and the Lee River DSC. It also includes some (but not all) construction works for PW75 between the tap structure east of the Lee River DSC and Whiteshell Station. The second part of Manitoba Hydro's PW75 Transmission Line work, for remaining construction of PW75 between the Lee River DSC and Whiteshell Station, shall be tendered at a later date and does not form part of this Request. Work required at a small quantity of structures on P1/P2 near Pointe du Bois is included in this RFP. Salvage of a portion of P3/P4 between Pointe du Bois and the Lee River DSC is included in this RFP. A detailed description of the scope of work is within Appendix 3 of Schedule II Technical Requirements, within Part B-Contract Documents of this Request. Question Acceptance Deadline: 2025/09/17 04:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Power Plant

$1,000,000.00

Public - State/Provincial

Site Work

279

44

211

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
4
Bidding Soon
28
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2025

December 1, 2025

Project location map

To Be Determined, Pointe du Bois, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.