BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2025 at 8:00 PM

Updated September 10, 2025

Site work for a civil project in Rocky Mountain House, Alberta. Completed plans call for site work for a bridge / tunnel; and road / highway.

During the pre-construction and design collaboration phase of the project, the successful Proponent will: 1. Participate in a partnering session including a pull planning session to determine the necessary project tasks and their sequence; 2. Develop a baseline construction schedule and cost estimate; 3. Provide input into the updating of the risk register; 4. Participate in a value engineering session; 5. Review of design details and specifications; 6. Provide ongoing bi-weekly input into the detailed design based on advantageous construction strategies, site constraints, construction means and methods, material availability, and other aspects of constructability; 7. Conduct and submit formal constructability reviews at the 60% and 90% design completions stages including budget and schedule updates; 8. Assist OCFN in ordering long-lead materials; 9. Generate and develop ECO and ESC plans for review and approval of OCFN's Consultant; 10. Provide input on in-water activity and methodologies as needed and provide input on aligning work schedules compliant with restricted activity periods. 11. Prepare construction traffic management strategies; and 12. Provide construction methodology information to the consultants and coordinate with the consultants during the application process to obtain regulatory approvals. Documents can be obtained from https://urbansystems.bidsandtenders.ca/

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - Federal

Site Work

23

23

8

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
4
Bidding Soon
94
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2025

November 1, 2025

Project location map

Multiple Locations, Rocky Mountain House, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.