BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 29, 2025

Demolition, site work, renovation and addition to a municipal facility in Harvey, Louisiana. Completed plans call for the addition of a 9,816-square-foot municipal facility; for the demolition of a municipal facility; for the renovation of a 2,542-square-foot municipal facility; and for site work for a municipal facility.

Construction of a new 9816 square foot forensic center and renovation of a 2542 square foot morgue for the Jefferson Parish Coroners Office. Scopes of Work: Selective demolition, concrete reinforcing, cast-in place concrete, structural steel framing, steel joist framing, steel decking, cold-formed metal framing, metal fabrications, metal stairs and ladders, pipe and tube railings, rough carpentry, sheathing, interior architectural woodwork, EIFS, storefront, glazing, Rytec Roll Up Door, non-structural metal framing, gypsum board, acoustical tile ceilings, resilient base, tile flooring, tile carpeting, interior wall cladding, interior & exterior painting, high-performance coatings, wall guard, corner guard, stainless steel corner guard, fire protection cabinets, fire extinguishers, metal lockers, residential appliances, fire suppression, plumbing, healthcare plumbing fixtures, vacuum equipment for laboratory and healthcare facilities, chemical-waste systems for laboratory and healthcare facilities, HVAC, electrical (Elan Lighting required), fire alarm system, site clearing, earthwork, erosion control, termite control, treated timber piles, concrete paving, striping, storm drain, site utilities. Further, upon receiving a notice to proceed, the Bidder agrees that all work shall be completed as follows: 334 Calendar Days for the completion of Phase 1 (New Morgue), a 3 week period for JPCO to move in, and 120 Calendar Days to complete Phase 2 (Renovation of Existing Morgue).

Post-Bid

Municipal

$1,400,000.00

Public - County

Addition, Demolition, Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
83
Bidding Soon
859
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

October 27, 2025

Project location map

2018 8th St, Harvey, LA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.