BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 2, 2025

Renovation of a multi-residential development in New-Wes-Valley, Newfoundland. Completed plans call for the renovation of a multi-residential development.

Closing Time: 1:00 PM (NT) Question Acceptance Deadline : 2025/08/20 01:00:00 PM NDT GENERAL 1. Provide all labour, materials, equipment, superintendence, temporary facilities and administration necessary to perform the Work outlined below and described in greater detail in this specification. 2. All work in this project is to be completed in accordance with all related NL Housing specifications and Occupational Health and Safety requirements. 3. Contractor is responsible to verify all measurements on site prior to work being completed. The NL Housing representative is to be contacted with any discrepancies prior to proceeding with the Work. 4. The following outline is general and is not to be considered complete in every detail. 5. Work for this project includes but is not limited to, (Interior and exterior Upgrades, 20 and 22 Circular Road, Pound Cove, NL), the following: Demolition (Both Units) 1. Removal of the following materials, but not limited to, asphalt shingles and related (1 unit), 2 p.t landings, partial ramp and 1 concrete landing pad (Front entry of unit 20), sections of concrete walkway, shrubbery(Poison Ivy) and alders, vinyl siding and accessories, windows, exterior door systems, eave fascia, soffit and eavestrough/downspouts, all exterior wall attachments, 1 bathtub. and surround, light fixtures, heaters/thermostats, 1 electrical panel and service, 1 HRV system, interior doors and other miscellaneous items. All materials not being reinstated are to be removed from site and disposed of at an Approved Waste Management Facility. 2. Contractor is responsible to move and re-install with the coordination of all utility companies, electrical, cable and telephone connections. Contractor is responsible for all items damaged during constructions. Contractor is required to Co-ordinate with Utility Companies before excavation to confirm location of underground electrical utilities. Cleaning (Both Units) 1. Construction areas are to be cleaned of construction debris and dust at the end of each work day as well as at the completion of the project. 2. Contractor is responsible to move any larger furniture items as needed to gain access to work area. All furniture and personal belongings need to be covered with plastic sheet to prevent contamination with construction dust and debris. Relocate all belongings back into position at completion of work. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Multi-Residential

$176,400.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

18

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
45
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

September 29, 2025

Project location map

22 Circular Rd, New-Wes-Valley, NL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.