Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 16, 2025 at 8:00 PM
Updated September 17, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Greenville, Mississippi. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
construction of 0.079 miles of BRIDGE REPLACEMENT AND APPROACHES on the AVON-DARLOVE ROAD being known as Project No. ERBR-76(08) in Washington County, Mississippi. Certified check or bid bond for five percent (5%) of the total bid, made payable to Washington County must accompany each proposal. Bidders are hereby notified that any proposal accompanied by letters qualifying in any manner the condition under which the proposal is tendered will be considered an irregular bid and such proposal will not be considered in making the award. PLANS AND SPECIFICATIONS are on file in the Office of the Chancery Clerk of Washington County and the Engineer's office. This project shall be constructed in accordance with the latest edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction.
Award
Bridges / Tunnels
$2,272,759.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 12, 2025
October 13, 2025
Avon-Darlove Road, Greenville, MS
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
